A customer has a Power 750 with the following: One processor

题目
单选题
A customer has a Power 750 with the following: One processor card with 8 cores enabled, and 64GB RAM installed One GX+ adapter with one I/O drawer attached; One 4-port 1Gbps IVE adapterPowerVM Standard Edition; They need to add a GX++ adapter and cable it to an I/O drawer. Which of the following must also be ordered?()
A

A second IVE adapter

B

A second processor card

C

PowerVM Enterprise Edition

D

An additional cable-management arm

参考答案和解析
正确答案: B
解析: 暂无解析
如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

A manufacturing customer has liminted space remaining in their data center and is concerned about rising power costs. The customer applications require very large amounts of memory. They want server redundancy and no downtime. Which of the following architectural features should be discussed with them?()

  • A、iDataPlex with vSphere
  • B、Four x3550 M3 servers,vSphere and racks
  • C、BladeCenter, HX5 blades and vSphere
  • D、One x3950 X5 servers andvSphere

正确答案:C

第2题:

The technician has replaced a power supply with an identical power supply, and now the high end graphics card is not working. Which of the following should the technician check?()

  • A、The memory
  • B、The CMOS battery
  • C、The PCIe power jack
  • D、The processor for chip creep

正确答案:C

第3题:

A customer has provided the pSeries technical specialist with details of an HACMP solution that they would like validated.  The solution is for two POWER4+ p630 servers directly attached to a FAStT600 storage server as the shared storage.  Each system has the following: ? 2 integrated network ports ?   2 fibre channel adapter cards   ? 1 power supply and redundant cooling   ? HACMP v5.1   In addition to a second power supply, what further requirements, if any, are needed to validate this solution and ensure no single point of failure? ()

  • A、One fibre channel switch
  • B、Two fibre channel switches
  • C、Two Ethernet cards
  • D、Nothing

正确答案:B

第4题:

A customer’s server is experiencing slow application response due to lack of processor power.  In which one of the following systems would the addition of the Expand On Demand processor upgrade feature benefit future expansion?()

  • A、An x255 with 4 processors
  • B、An x365 with 4 processors
  • C、An x445 with 4 processors
  • D、An x445 with 32 processors

正确答案:C

第5题:

A System p customer is planning to implement virtualization and is concerned about how to respond  to an increased workload and what limitations there are for very small workloads.  Which of the following describes the minimum size for an LPAR and the minimum amount that can be transferred from on LPAR to another()

  • A、Smallest partition 10% of all available processors, as small as 1% of all available processors may be transferred.
  • B、Smallest partition 10% of a processor, as small 1% of a processor may be transferred.
  • C、Smallest partition one processor, as small 1% of a processor may be transferred.
  • D、Smallest partition one core, as small 10% of a processor may be transferred.

正确答案:B

第6题:

A technician is building a Windows 2008 server and has installed a motherboard, processor, and power supply. Which of the following optical drives should the technician install?()

  • A、Flash Drive
  • B、DVD-RW
  • C、CD-ROM
  • D、SSD

正确答案:B

第7题:

Companycom has purchased a p5 590 with 16 CPUs. To run Simultaneous Multi-Threading (SMT) with a 4-way virtual processor partition with 2.0 processing units of entitlement, how many logical CPUs will be allocated?()

  • A、8-way logical CPU partition, where each logical CPU has the power of 25% of a logical processor 
  • B、4-way logical CPU partition, where each logical CPU has the power of 50% of a physical processor 
  • C、8-way logical CPU partition, where each logical CPU has the power of 25% of a physical processor 
  • D、16-way logical CPU partition, where each logical CPU has the power of 25% of a physical processor

正确答案:C

第8题:

A customer would like to buy a new Power 750 and attach 2 PCIe I/O drawers. What is the minimum configuration which will support this?()

  • A、One processor card and one GX+ expansion card
  • B、Two processor cards and one GX++ expansion card
  • C、One processor card, one GX+ expansion card, and one GX++ expansion card
  • D、Two processor cards, one GX+ expansion card, and one GX++ expansion card

正确答案:C

第9题:

A customer has a key application running in a logical partition on a POWER5 system. The customer wants the ability to run the application with minimal down time using Live Partition Mobility.  Which of the following is the minimum PowerVM edition and hardware configuration that will support the customer requirement?()

  • A、 PowerVM Standard Edition on POWER6 hardware
  • B、 PowerVM Standard Edition with POWER5 hardware 
  • C、 PowerVM Enterprise Edition with POWER6 hardware
  • D、 PowerVM Enterprise Edition with POWER5 hardware

正确答案:C

第10题:

A customer has requested five rack mounted servers, and a rack. They want redundant power connections. Which of the following is required to meet these requirements?()

  • A、Redundant power supplies on the servers
  • B、Redundant PDUs in the rack
  • C、edundant power supplies in the servers and redundant PDUs in the rack
  • D、Redundant power supplies in the servers, redundant PDUs in the rack, and Active Energy Manager (AEM)

正确答案:C