A customer is in the process of testing their configuration 

题目
单选题
A customer is in the process of testing their configuration prior to going live. The administrator discovers thatPowerHA is taking 31 seconds to deal with a standard NIC failure. What can the administrator do to speed upthe process of NIC failure detection and diagnosis?()
A

Tune the topsvcs NIM settings

B

Tune the grpsvcs NIM settings

C

Activate the fast failure detection (FFD) feature

D

Activate the Gigabit fast failover feature on the physical adapters

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

A customer is deploying a new Junos Pulse Access Control Service and has completed the initial boot configuration as prompted using a serial connection. The customer now wants to complete the rest of the configuration using the admin GUI.Into which port on the Junos Pulse Access Control Service should the customer plug the network cable to enable access to the admin GUI?()

A. the internal interface

B. the external interface

C. the management interface

D. the console interface


参考答案:A

第2题:

●The development process in the software (74) involves four phases: analysis,design,implementation, and testing.

(74)A.maintenance

B.lifecycle

C.programming

D.upgrading


正确答案:B

第3题:

Integration(73)is the process of verifying that the components of a system work together as described in the program design and system design specifications.(73)

A.trying

B.checking

C.testing.

D.coding


正确答案:C
解析:集成测试是验证系统各个组成部分能否按程序设计和系统设计规格说明书所描述的方式一起工作的过程。

第4题:

During the implement phase, systems acceptance testing does which of the following for the customer? Select exactly 1 answer(s) from the following:()。

  • A、installation, configuration, and testing, as well as the commissioning of tools and processes in accordance with the operations implementation plan
  • B、provision of information regarding customer-specified design requirements and configuration
  • C、the migration of network services from an existing state to a future state in accordance with the migration plan
  • D、the provision of an objective means of measuring system operability and functionality

正确答案:D

第5题:

The development process in the software______involves four phases:analysis,design,implementation,and testing.

A.maintenance
B.1ife cycle
C.programming
D.upgrading

答案:B
解析:
软件生命周期中的开发过程包括四个阶段:分析、设计、实现和测试。

第6题:

A customer wants to create a custom Junos Pulse configuration. Which two are required?()

A. Connection set

B. Configuration set

C. Custom installer

D. Component set


参考答案:A, D

第7题:

(75)refers to the process of testing and then eliminating errors.

A.Debugging
B.Programming
C. Analysis
D.Maintenance

答案:A
解析:
调试指的是测试并纠错的过程。

第8题:

In the system development process,modularity is a very well-established principle used in the______phase.

A.design

B.analysis

C.implementation

D.testing


正确答案:A
解析:早期的远程通信方法是电报这种通讯方式。

第9题:

The development process in the software ______ involves four phases: analysis, design, implementation, and testing.

A.maintenance]
B.1ife] cycle]
C.programming
D.upgrading

答案:B
解析:
软件生命周期中的开发过程包括四个阶段:分析、设计、实现和测试。

第10题:

( ) is the process of documenting, analyzing, tracing, prioritizing and agreeing on requirements and then controlling change and communicating to relevant stakeholders. It is a continuous process throughout a project.

  • A、Integrated management
  • B、Configuration management
  • C、Scope management
  • D、Requirements management

正确答案:D

更多相关问题