Tune the topsvcs NIM settings
Tune the grpsvcs NIM settings
Activate the fast failure detection (FFD) feature
Activate the Gigabit fast failover feature on the physical adapters
第1题:
A customer is deploying a new Junos Pulse Access Control Service and has completed the initial boot configuration as prompted using a serial connection. The customer now wants to complete the rest of the configuration using the admin GUI.Into which port on the Junos Pulse Access Control Service should the customer plug the network cable to enable access to the admin GUI?()
A. the internal interface
B. the external interface
C. the management interface
D. the console interface
第2题:
●The development process in the software (74) involves four phases: analysis,design,implementation, and testing.
(74)A.maintenance
B.lifecycle
C.programming
D.upgrading
第3题:
Integration(73)is the process of verifying that the components of a system work together as described in the program design and system design specifications.(73)
A.trying
B.checking
C.testing.
D.coding
第4题:
During the implement phase, systems acceptance testing does which of the following for the customer? Select exactly 1 answer(s) from the following:()。
第5题:
第6题:
A. Connection set
B. Configuration set
C. Custom installer
D. Component set
第7题:
第8题:
In the system development process,modularity is a very well-established principle used in the______phase.
A.design
B.analysis
C.implementation
D.testing
第9题:
第10题:
( ) is the process of documenting, analyzing, tracing, prioritizing and agreeing on requirements and then controlling change and communicating to relevant stakeholders. It is a continuous process throughout a project.