A customer needs a remote data copy, data migration, and off-site backup solution. The solution cannot impact application performance. The sites are over continental distances.  Which  characteristic of DS8700 Global Mirror makes it a good fit for this customer()
A

it provides synchronous mirroring on both sides

B

it can be implemented withoutFlashCopy volumes at the target site

C

with Global Mirror, the Metro Mirror functions can be used over continental distances

D

it has almost no impact on application performance because of its extremely short and adjustable coordination time

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

A customer has a combination of fifteen Windows file servers with direct attached storage and three Power Systems with AIX database servers SAN attached to a DS4700.  They would like to upgrade and plan for 40 TB capacity.  The customer needs to move to a more scalable storage system to include all servers.Which of the following would be most appropriate to ask first?()

  • A、What are the plans for Disaster Recovery? 
  • B、What are the plans for data migration? 
  • C、Would iSCSI meet your needs? 
  • D、How much space is available in the current storage systems?

正确答案:B

第2题:

A storage specialist is explaining to the customer that relational databases need an additional point-in-time copy process to assure data in memory buffers are flushed to disk prior to the hardware based snapshot command being executed.  Which IBM software solution provides usable and consistent point-in-time data copies()

  • A、Tivoli Storage Productivity Center for Disk
  • B、Tivoli Continuous Data Protection for Files
  • C、Tivoli StorageFlashCopy Manager
  • D、Tivoli Storage Productivity Center for Data

正确答案:C

第3题:

The technician is working on a system and has determined that the hard drive must be reimaged. However, the customer wants to retain all the data. Which of the following would take the LEAST amount of time to implement?()

  • A、Create a new partition on the hard drive, copy all data to the new partition, reimage the drive, and the old data will be on the new partition and accessible.
  • B、Install a new hard drive, slave the old drive, image the new drive, and show the customer how to access their data on the old drive.
  • C、Upload the data to an external FTP server, reimage the drive, and then restore the data to the newly imaged drive.
  • D、Copy data to a USB connected hard drive, reimage the drive, and then restore the data to the newly imaged drive.

正确答案:D

第4题:

A mainframe customer with a 2105-800 storage subsystem will be migrating to a new data center.They will be replacing existing servers with newer hardware and the 2105 subsystem with an IBMSystem Storage DS8100. The data centers are 613 kilometers apart. The data migration andproduction cutover must be accomplished with minimal disruption. Which solution best meetsthese requirements?()

  • A、Metro Mirror
  • B、HSM
  • C、SVC
  • D、Global Copy

正确答案:D

第5题:

A customer has a requirement for Disaster Recovery for compliance within their industry. Theyhave an RPO of 4 hours and an RTO of 24 hours. Cost is a consideration. What is the most costeffective DR implementation?()

  • A、a disk-to-disk backup solution keeping all storage in the data center
  • B、a backup solution that includes magnetic tape that is shipped to an off-site storage facility
  • C、a less powerful copy environment at a hot site with asynchronous mirroring and cluster technology
  • D、an exact copy of the primary environment at a hot site with remote mirroring and cluster technology

正确答案:B

第6题:

A customer is planning to migrate a financial application to a 12-way p5-570 system with 96GB of memory.  The application data is stored on an ESS Model 800 attached to a p670 server with AIX 5.2.  They will have a short outage window to perform the data migration.  What is the quickest way to move all the data stored on the attached ESS from the p670 to the new p5-570?()

  • A、Use rsync to synchronize the data across servers.
  • B、Use exportvg and importvg to move the data to the target system.
  • C、Use NFS to copy the data from the source system to the target system.
  • D、Backup the data from the source system and restore to the target system.

正确答案:B

第7题:

A customer has two locations that host their pSeries servers.  Traffic is being routed through the public Internet.  The customer needs to exchange confidential financial data between the servers.  Which of the following solutions should the pSeries technical specialist propose to the customer to secure the data?()

  • A、A DCE domain
  • B、A Kerberos domain
  • C、A PPP tunnel between the servers
  • D、An IPSEC tunnel between the servers

正确答案:D

第8题:

An IBM XIV system with nine modules and 2 TB disks is being proposed to a customer who needs to increase disk capacity in the data center. The customer is concerned about data growth andcost after the initial purchase. Which of the following factors of the solution should be stressed to the customer to address data growth?()

  • A、the XIV system can be scaled by the addition of modules
  • B、XIV offers thin provisioning for all available host operating systems
  • C、reduced operating costs will pay for another XIV system in less than two years
  • D、the management GUI allows the administrator tovirtualize the entire storage system quickly

正确答案:A

第9题:

A customer needs a remote data copy, data migration, and off-site backup solution. The solution cannot impact application performance. The sites are over continental distances.  Which characteristic of DS8700 Global Mirror makes it a good fit for this customer()

  • A、it provides synchronous mirroring on both sides
  • B、it can be implemented withoutFlashCopy volumes at the target site
  • C、with Global Mirror, the Metro Mirror functions can be used over continental distances
  • D、it has almost no impact on application performance because of its extremely short andadjustable coordination time

正确答案:D

第10题:

A customer requires an infrastructure to support disaster recovery of critical applications between two remote data centers. One data center is in Tokyo and one is in Beijing. The customer’s Recovery Point Objective (RPO) requires a six-hour window for a bandwidth of 100 MB/s and a new storage system for a total of 4 TB of data. They estimate 100 MB of new data produced hourly. What data synchronization method would be recommended to meet the requirements()

  • A、Metro Mirror
  • B、FlashCopy
  • C、Global Mirror
  • D、Snapshot

正确答案:C