Company.com with a newly installed cluster has been checking

题目
单选题
Company.com with a newly installed cluster has been checking the logfiles to determine if the  cluster has had any recent activity. The non-IP RS232 heartbeat connection seems to be having a difficulty. The serial network goes down,and then a couple of minutes later comes back up again. This pattern is repeated many times in the log.  If this system was installed without regard to best practices, what is the most likely problem with the serial network?()
A

 The serial port is malfunctioning and needs to be repaired.

B

 The baud rate is incorrectly specified in the AIX devices configuration.

C

 The serial port is not a port approved to support HACMP heartbeat traffic.

D

 The baud rate is incorrectly specified in the HACMP interface configuration.

参考答案和解析
正确答案: C
解析: 暂无解析
如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

The project budget has been finalized.Additional work has been discovered that was not planned for in the budget or project scope. (74) could provide the fund to cover the newly discovered work item.

A.Contingency reserve
B.Project profit
C.Management reserve
D.Special fund

答案:C
解析:
项目的预算还未最终确定,额外的工作已经发现,没有计划的预算或并不在项目范围内。管理储备可以提供该基金支付新发现的工作项。

第2题:

An administrator has added an additional network adapter to each cluster node. The adapters  have been configured and tested, and the /etc/hosts file has been updated. However,the adapters do not appear in the pick list when the administrator tries to define the adapters to HACMP.  What would be required to correct this problem?()  

  • A、 Rerun autodiscovery.
  • B、 Synchronize the cluster.
  • C、 Restart cluster services.
  • D、 Delete and recreate the adapters.

正确答案:A

第3题:

●The project budget has been finalized.Additional work has been discovered that was not planned for in the budget or project scope.(74) could provide the fund to cover the newly discovered work item.

(74) A. Contingency reserve

B. Project profit

C. Management reserve

D. Special fund


正确答案:C

第4题:

A customer has just purchased six x346 servers running Windows 2003 Web Edition.They are expecting to add six additional x346’s in three months.They have a requirement to automatically deploy the current server image upon the new servers. What TWO actions are required to complete this task?()

  • A、Ensure Director Agent is installed on the new servers.
  • B、Ensure a DHCP Sever is installed and configured in the environment.
  • C、Ensure Server Plus Pack option has been installed and configured.
  • D、Ensure Software Distribution has been installed on the IBM Director Server and an image has been created.
  • E、Ensure Remote Deployment Manager has been installed on the IBM Director Server and an image has been created.

正确答案:B,E

第5题:

The technician has suspicions that a browser has been hijacked. Which of the following should the technician look for in this situation?()

  • A、A new default gateway has been setup.
  • B、A new Internet shortcut has been added.
  • C、A new web browser has been installed and is now the default.
  • D、A proxy server has been enabled.

正确答案:D

第6题:

Company.com has a cluster with nodes that support "hot swap" adapters. During an upgrade of  The network infrastructure,an additional network adapter has been added to the nodes and configured in AIX.  What is the next step required to add this adapter to HACMP?()  

  • A、 Stop the node.
  • B、 Stop the cluster.
  • C、 Run autodiscovery.
  • D、 Configure the IP adapter.

正确答案:C

第7题:

Company.com with a newly installed cluster has been checking the logfiles to determine if the  cluster has had any recent activity. The non-IP RS232 heartbeat connection seems to be having a difficulty. The serial network goes down,and then a couple of minutes later comes back up again. This pattern is repeated many times in the log.  If this system was installed without regard to best practices, what is the most likely problem with the serial network?()  

  • A、 The serial port is malfunctioning and needs to be repaired.
  • B、 The baud rate is incorrectly specified in the AIX devices configuration.
  • C、 The serial port is not a port approved to support HACMP heartbeat traffic.
  • D、 The baud rate is incorrectly specified in the HACMP interface configuration.

正确答案:C

第8题:

Modern machinery()been installed in this newly built factory.

A、 have

B、 has

C、 is


参考答案:B

第9题:

A user is browsing to a newly created internal site called www.comptia.org. After putting incredentials the page comes up blank. Which of the following is MOST likely the cause?()

  • A、The user must add the new site to the local log file.
  • B、A proxy exception has not been configured.
  • C、SMTP has not been configured.
  • D、The loopback address has not been configured.

正确答案:B

第10题:

WebSphere Commerce has been successfully installed and tested.  WebSphere Commerce Analyzer has been installed and the extraction programs have run with no errors but there is no data in any reports when viewed from the WebSphere Commerce Accelerator.  What could be the cause of this problem?()

  • A、The WebSphere Commerce application server was not started
  • B、The web server was not started
  • C、SSL has not been configured on the web server
  • D、The appropriate listeners were not enabled in Configuration Manager
  • E、The database server was not started

正确答案:D

更多相关问题