While running long running queries, you receive the Snapshot too old error. Which advisor can help you to avoid the Snapshot too old error?()
第1题:
While paralleling two AC generators using synchronizing lamps only, both lamps will go dark when the generators are______.
A.running at the same speed
B.grounded
C.of the same polarity
D.in phase
第2题:
第3题:
A.It has more than one interface that is connected to the root network segment.
B.It is running RSTP while the elected root bridge is running 802.1d spanning tree.
C.It has a higher MAC address than the elected root bridge.
D.It has a higher bridge ID than the elected root bridge.
第4题:
You have an SQL query that takes one minute to execute. You use the following code segment to execute the SQL query asynchronously.Dim ar As IAsyncResult = cmd.BeginExecuteReader( )You need to execute a method named DoWork( ) that takes one second to run while the SQL query is executing. DoWork( ) must run as many times as possible while the SQL query is executing. Which code segment should you use?()
第5题:
How does the Extended Get Digit String step differ from the Get Digit String? ()
第6题:
You start a centrifugal cargo pump to discharge cargo.The pump works for a while and then loses suction.This could be caused by ______.
A.The pump running backwards
B.Incomplete priming
C.The discharge head being too high
D.All of the above
第7题:
第8题:
A.This switch has more than one interface connected to the root network segment in VLAN 2.
B.This switch is running RSTP while the elected designated switch is running 802.1d Spanning Tree.
C.This switch interface has a higher path cost to the root bridge than another in the topology.
D.This switch has a lower bridge ID for VLAN 2 than the elected designated switch.
第9题:
While discussing the customer’s environment the storage specialist discovers that the customerhas both Windows and UNIX servers running various applications. The customer is looking for acost effective 10 TB solution that includes a mirrored site to meet their Disaster Recovery plan.Which of the following solutions should be recommended?()
第10题:
While an electrician was adding additional circuits for the Data Center, the system running the Database inadvertently powered down. The fallover of the service IP labels and volume groups to the hot standby node completed as expected; however, the database did not start. The database log file indicated that the database was already started. What is the most likely cause of this problem?()