Crossing the spring lines
Slacking all forward running lines while keeping all after running lines taut
Doubling up on spring or breast lines
Slacking bow and stern lines
第1题:
A storm is forecast for the area where your vessel is moored. For its safety you should put ______.
A.more slack in the mooring lines
B.a strain on the mooring lines
C.chafing gear on the mooring lines
D.grease on the mooring lines
第2题:
Between 1638 and 1650 hours this day,strong gusty winds were ______ by my vessel,in consequence of which,the vessel's four mooring lines were broken and her portside gangway severely damaged.
A.gone
B.done
C.had
D.experienced
第3题:
You are writing a method that accepts a string parameter named message.Your method must break the message parameter into individual lines of text and pass each line to a second method named Process.Which code segment should you use?()
A.
B.
C.
D.
第4题:
Which of the following is not the duty of the sailor on gangway watch? ()
第5题:
Would you please ()the mooring lines ?
第6题:
Between 1830 hrs and 1850 hrs this day,strong gusty winds ______ by my vessel,in consequence of which the vessel's four mooring lines were broken.
A.was experienced
B.were experienced
C.has experienced
D.have experienced
第7题:
If two mooring lines are to be placed on the same bollard,which method is BEST?______.
A.Place the eye from the forward line on the bollard and then place the eye from the second line directly over the first
B.It makes no difference how the lines are placed
C.Place the eye from either line on the bollard,and then bring the eye of the other line up through the eye of the first,and place it on the bollard
D.Place both eyes on the bollard,in any manner,but lead both lines to the same winch head on the vessel and secure them on the winch
第8题:
Based on what you know of the job market,which of your courses were the most useful?The least?
第9题:
The ()(系泊缆绳)consist of a head line ,two breast lines, two spring lines and a stern line.
第10题:
Adjusting the mooring lines in time.()