第1题:

During which phase of the project life cycle is the amount at stake lowest?

A concept

B development

C execution

D conclusion

E C and D


正确答案:A

第2题:

141 Feasibility studies occur in which life cycle phase (s)?

A. Conceptual

B. Conceptual or Development

C. Execution

D. Preliminary planning

E. any life cycle phase


正确答案:A

第3题:

Feasibility studies occur in which life cycle phase (s)?

A.Conceptual

B.Conceptual or Development

C.Execution

D.Preliminary planning

E.any life cycle phase


正确答案:A
A

第4题:

寄生虫生活史(life cycle)


正确答案:是指寄生虫完成一代生长、发育和繁殖的整个过程,它包括寄生虫的感染阶段感染宿主的方式和途径,虫体在宿主体内移行途径与定居部位、离开宿主方式,发育过程中所需的各种宿主、传播媒介以及内外环境条件等。

第5题:

● A project life cycle is a collection of generally sequential project (73)whose name and number are determined by the control needs of the organization or organizations involved in the project. The life cycle provides the basic (74)for managing the project, regardless of the specific work involved.

(73)

A. phases

B. processes

C. segments

D. pieces

(74)

A. plan

B. fraction

C. main

D. framework


正确答案:A,D

第6题:

74 Life cycle costing is the total cost to the customer for the acquisition and ownership over its full life. Life cycle costing categories include the cost of _____, _____, and _____.

A. R & D, maintainability, operation and support.

B. R & D, production, operation and support.

C. Acquisition, operations, maintenance.

D. Production, operations, maintenance.

E. None of the above


正确答案:B

第7题:

● Feasibility studies occur in which life cycle phase (s)?

A Conceptual

B Conceptual or Development

C Execution

D Preliminary planning

E any life cycle phase


正确答案:A

第8题:

Life cycle costing is the total cost to the customer for the acquisition and ownership over its full life. Life cycle costing categories include the cost of _____, _____, and _____.

A . R & D, maintainability, operation and support.

B . R & D, production, operation and support.

C . Acquisition, operations, maintenance.

D . Production, operations, maintenance.

E . None of the above


正确答案:C

第9题:

A project life cycle is a collection of generally sequential project (73) whose name and number are determined by the control needs of the organization or organizations involved in the project. The life cycle provides the basic (74) for managing the project, regardless of the specific work involved.

A.phases

B.processes

C.segments

D.pieces


正确答案:A

第10题:

The life cycle of a project is a description of the various phases of the project from the beginning to the end. One of the followings is not a phase of the traditional project life cycleIt is().

A.development

B.concept

C.system analysis

D.implementation


正确答案:B