第1题:
122 Using the problem stated in the Special window, Calculate the expected value of duration (in days) using the PERT concept of the expected duration of a task
A. 8.0
B. 8.8
C. 9.1
D. 9.7
E. 10.5
第2题:
● Project schedule management is made up of six management processes including: activity definition, activity sequencing, ( 71) , and schedule control by order.
(71)
A.activity duration estimating, schedule developing, activity resource estimating
B . activity resource estimating, activity duration estimating, schedule development
C.schedule developing, activity resource estimating, activity duration estimating
D.activity resource estimating, schedule developing, activity duration estimating
第3题:
Using the problem stated in the Special window, Calculate the deviation of duration for the task, using the PERT concept of standard deviation of task duration.
A . 0.5
B . 1
C . 1.8
D . 2.2
E . 2.8
第4题:
● Each box is an activity; the number it contains is the duration of the activity in days. The duration of the critical path is (75) .
(75)
A.16 days
B.14 days
C.19 days
D.20 days
第5题:
Each box is an activity; the number it contains is the duration of the activity in days. The duration of the critical path is(75)
A.16days
B.14days
C.19days
D.20days
第6题:
A.SeRviCe、teRmiNAl、CAll/houR、duRAtioN、UL/DLvolume
B.CAll/houR、duRAtioN、UL/DLvolume
C.SeRviCe、teRmiNAl
D.SeRviCe、teRmiNAl、CAll/houR、duRAtioN
第7题:
如果UE收到DRX Command的MACCE后,以下描述正确的是()。
A.停止Duration Timer
B.启动Duration Timer
C.启动drx-Retransmission Timer
D.停止drx-Retransmission Timer
第8题:
Using the problem stated in the Special window, Calculate the expected value of duration (in days) using the PERT concept of the expected duration of a task
A . 8
B . 8.8
C . 9.1
D . 9.7
E . 10.5
第9题:
A.Speed/Duration对话框输入正值
B.Speed/Duration对话框中选择Reverse Speed选项
C.Rate Stretch Tool
D.Backwards特效
第10题:
A.BS有较多的机会来调整数据传输的速率
B.如果数据包长度比较短时,采用短的Duration,传输效率更高
C.TCP性能更加优越