The company has purchased one hundred and fifty new servers. The server administrator needs to build and deploy them as quickly as possible. Which of the following is the FASTEST method of building and deploying each server?()A、Build each server from the 

题目

The company has purchased one hundred and fifty new servers. The server administrator needs to build and deploy them as quickly as possible. Which of the following is the FASTEST method of building and deploying each server?()

  • A、Build each server from the OS manufacturer’s build disk.
  • B、Use an imaging system to manually deploy the build to the servers.
  • C、Build each server with the manufacturer’s build disk.
  • D、Give the company build disk to the server manufacturer.
如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

A company has several legacy servers that upper management would like to move into a virtual environment. Which of the following is the FIRST step an administrator should take to evaluating whether the servers can be moved into the virtual environment?()

  • A、 Compare the costs of maintenance between the physical and virtual servers.
  • B、 Run SYSPREP on each legacy server.
  • C、 Check the HCL on each legacy server.
  • D、 Verify that all the latest OS service packs are installed on each server.

正确答案:C

第2题:

The company has two thousand servers located around the globe. Which of the following is the BEST method of patch management and deployment?()

  • A、Set all servers to automatically download patches from the manufacturer’s website.
  • B、Install an internal patch management system and deploy from the system.
  • C、Install the patches on each server from a deployment disk.
  • D、RDP into each server, manually download and install the patches.

正确答案:B

第3题:

Which of the following is a best practice that can be used to ensure consistency when building systems?()

A. Server build checklist

B. Server baselining tools

C. Architecture diagrams

D. Hardware compatibility list


参考答案:A

第4题:

Your network consists of a single Active Directory site that includes two network segments. Thenetwork segments connect by using a router that is RFC 1542 compliant. You plan to use Windows Deployment Services (WDS) to deploy Windows Server 2008 R2 servers. All new servers support Pre-Boot Execution Environment (PXE).  You need to design a deployment strategy to meet the following requirements: èSupport Windows Server?2008 R2   èDeploy the servers by using WDS in both network segments èMinimize the number of servers used to support WDS What should you include in your design?() 

  • A、Deploy one server. Install WDS and DHCP on the server. Configure the IP Helper tables on therouterbetween the network segments.
  • B、Deploy two servers. Install WDS and DHCP on both servers. Place one server on each of the network segments. Configure both servers to support DHCP option 60.
  • C、Deploy two servers. Install WDS and DHCP on both servers. Place one server on each of the network segments. Configure both servers to support DHCP option 252.
  • D、Deploy two servers. Install WDS and DHCP on one server. Install DHCP on the other server. Place one server on each of the network segments. Configure both servers to support DHCP option60.

正确答案:A

第5题:

ompany.com has a Micro-Partitioned p5-570 4-way with six application partitions and two VIO servers. Each VIO server has been allocated 0.5 CPU and the application servers have been allocated 0.4 CPUs. The marketing department wants to deploy a new Web server to support the release of a product. The systems architect has recommended that the Web server will require a whole CPU. Which of the following should the technical specialist suggest to provide the most cost-effective deployment?()

  • A、Remove one application server partition and apply its CPU resources to the Web server.
  • B、Reassign the CPU from one of the VIO servers and create the new partition.
  • C、Add 0.6 CPU to one of the application servers and run the Web service with the application. 
  • D、Reassign a total of 0.4 CPUs from the application servers and create a new partition with awhole CPU for new deployment.

正确答案:D

第6题:

Which of the following is a best practice that can be used to ensure consistency when building systems?()

  • A、Server build checklist
  • B、Server baselining tools
  • C、Architecture diagrams
  • D、Hardware compatibility list

正确答案:A

第7题:

A company is deploying a new file server to consolidate shares from several legacy servers. Which of the following is the BEST method to ensure that the new file shares are being used?()

  • A、 Setup the new file server and shut down the legacy servers.
  • B、 Remove all the DNS entries for the legacy servers.
  • C、 Create a logon script to remap the old file shares to the new file shares.
  • D、 Go to each users computer, remove all shares and setup the new shares.

正确答案:C

第8题:

Management has asked the server technician to deploy fourteen new servers with newly-released operating systems in the virtual environment for testing purposes.  Which of the following is the FASTEST way to do this?()

  • A、Create a template of an existing server and deploy the fourteen images from that server.
  • B、Create a server template, and deploy all fourteen servers from this template.
  • C、Create one server, create a backup image, and restore thirteen servers from the image.
  • D、Create each server individually.

正确答案:B

第9题:

Your network contains two Active Directory sites. The sites connect to each other by using a WAN link.  You plan to deploy two Exchange Server 2010 Mailbox servers and two Client Access servers in eachsite.  Each site will contain a Client Access array.  You need to recommend a solution to deploy Hub Transport servers. The solution must meet the following requirements: .Continue to deliver e-mail messages to users in other sites if a single Hub Transport server fails .Support the planned Client Access array deployment.Minimize the number of Exchange servers What are two possible ways to achieve this goal?()

  • A、Add the Hub Transport server role to each Mailbox server.
  • B、Add the Hub Transport server role to each Client Access server.
  • C、Deploy two Hub Transport servers on two new servers in each site.
  • D、Deploy one Hub Transport server on a new server, and then install the SMTP service on each ClientAccess server.

正确答案:A,B

第10题:

Your network contains three Active Directory sites named Site1, Site2, and Site3. Users can only access Site1 from the Internet.  In each site, you plan to deploy a Mailbox server and a Hub Transport server.  You need to plan the deployment of Exchange servers to meet the following requirements: .Ensure that Exchange ActiveSync and Outlook Anywhere clients can connect to their Mailboxes from theInternet .Minimize hardware costs What should you include in your plan?()

  • A、In Site1, deploy one Client Access server.
  • B、In each site, deploy one Client Access server.
  • C、In Site1, deploy one Client Access server and one Edge Transport server.
  • D、In each site, deploy one Client Access server and one Edge Transport server.

正确答案:B