it is cost efficient, as a single N series or DS8000 can have its controllers split between the primary and secondary site and use semi- synchronousmirroring while using asynchronous mirroring to a third site
the second site acts as a repeater station so that greater geographical distances can be achieved
ITprovides high availability together with disaster recovery by implementing Metro/Global Mirror across three geographically dispersed systems
it guarantees data protection by implementing two synchronous copies of the primary site data
第1题:
18 Interfacing with the customer after project go-ahead is the responsibility of:
A. Project sponsor
B. Project team
C. Project manager
D. Functional manager
E. All of the above are possible, based upon the size and complexity of the project
第2题:
● The appointment or selection of a project sponsor is often based upon:
A The strategic importance of the project
B Who the customer is
C Whether the organization is project or non-project-driven
D The profitability of the project
E All of the above
第3题:
The appointment or selection of a project sponsor is often based upon:
AThe strategic importance of the project
BWho the customer is
CWhether the organization is project or non-project-driven
DThe profitability of the project
EAll of the above
第4题:
Which service component within the prepare phase recommends the appropriate technology strategy to address a business requirement of the customer?()
第5题:
A customer has a very large number of physical Windows-based servers and no centralized storage. Which technology solution will help the customer to reduce the footprint of their existing server estate?()
A. z/OS, DS8000, TSM
B. TSM, LTO-5, VMware
C. System x, VMware, XIV
D. System p, VMware, DS5000
第6题:
32 The appointment or selection of a project sponsor is often based upon:
A. The strategic importance of the project
B. Who the customer is
C. Whether the organization is project or non-project-driven
D. The profitability of the project
E. All of the above
第7题:
A. It profiles based on bandwidth.
B. It profiles based on loss priority.
C. It prevents traffic loss through buffering.
D. It prevents global synchronization with tail drops.
第8题:
Interfacing with the customer after project go-ahead is the responsibility of:
AProject sponsor
BProject team
CProject manager
DFunctional manager
EAll of the above are possible, based upon the size and complexity of the project
第9题:
Which two models are the models of DiffServ-Award traffic Engineering?()
第10题:
A customer has multiple applications on multiple open platforms in their current environment based on IBM System Storage DS8100. They plan to set up a business continuity solution that meets the objective of zero or little data loss for their business critical data. The customer has indicated that cost is a factor. What should the storage specialist recommend()