()(收紧) the slack on the stern line.

题目
单选题
()(收紧) the slack on the stern line.
A

Heave out

B

Take in

C

Pick in

D

Heave away

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

尾推停车。

A.Stern thrust stop.

B.Stern stop.

C.Stern stop.

D.Bow thrust stop.


正确答案:A

第2题:

A fire is discovered in the bow of your vessel while making way. The wind is from ahead at 35 knots. You should ______.

A.remain on course and hold speed

B.remain on course but slack the speed

C.change course to put the wind on either beam and increase speed

D.change course and put the stern to the wind


正确答案:D

第3题:

As a project is carried out and slack time is consumed on individual tasks, the slack left over for the remaining tasks is:

A.Insignificant.

B.Reduced.

C.Unchanged.

D.Increased.

E.Doubled.


正确答案:C
C

第4题:

尾推全速向左!()

  • A、Bow stern full to port!
  • B、Bow stern half to port!
  • C、Stern thrust half to starboard !
  • D、Stern thrust full to port!

正确答案:D

第5题:

A fire is discovered in the forepeak of a vessel at sea. The wind is from ahead at 35 knots. You should ______.

A.remain on course and hold speed

B.change course and put the stern to the wind

C.change course to put the wind on either beam and increase speed

D.remain on course but slack the speed


正确答案:B
在海上航行船首尖舱着火,风以35节速度从船首吹来,你应该改向,以船尾受风。

第6题:

首推停车。

A.Stern thrust stop.

B.Stern stop.

C.Stern stop.

D.Bow thrust stop.


正确答案:D

第7题:

Which of the following actions are stated in the correct order prior to loading or discharging cargo on a Ro-Ro vessel?

A.Lower the stern ramp,raise/open the stern door,turn on ventilation for cargo holds

B.Turn on ventilation for cargo holds,raise/open the stern door,lower the stern ramp

C.Turn on ventilation for cargo holds,lower the stern ramp,raise/open the stern door

D.Raise/open the stern door,lower the stern ramp,turn on ventilation for cargo holds


正确答案:A

第8题:

The basic terminology for networks includes:

A.Activities, events, manpower, skill levels and slack.

B.Activities, documentation, events, manpower and skill levels.

C.Slack, activities, events, and time estimates.

D.Time estimates, slack, sponsorship involvement, and activities.

E.Time estimates, slack time, report writing, life cycle phases, and crashing times.


正确答案:C
C

第9题:

“Ease the strain on the stern line” means “()”!

  • A、Heave away the stern line.
  • B、Take in the stern line.
  • C、Slack the stern line.
  • D、Heave in the stern line.

正确答案:C

第10题:

This mooring line is a little slack. Please ()it.

  • A、fast
  • B、fasten
  • C、slack away
  • D、slack

正确答案:B

更多相关问题