A customer wants to implement the following Blades in BladeC

题目
单选题
A customer wants to implement the following Blades in BladeCenter H:Two POWER Blades running IBM i partitions.Two POWER Blades running AIX and LinuxFour x86 Blades running Windows. Which of the following design consideration statements is correct?()
A

The Blades must use the same CIOv and CFFh expansion adapter types.

B

Two physical BladeCenter H chassis will be required. One for the POWER Blades, the other for the x86  Blades.

C

The x86 Blades and POWER Blades may use different expansion adapters provided the POWER Blades  are in bays 1-7 and the x86 Blades are in slots 8-14.

D

The x86 Blades and POWER Blades may use different expansion adapters, provided the corresponding I/O modules to Blade midplane connections are configured in the Advanced Management Module (AMM).

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

A banking customer orders three IBM BladeCenter E chassis and thirty-four HS22 blades. Theustomer wants to fully populate the chassis with blades where possible. Which of the following is the minimum number of power cables required to provide redundancy? ()

  • A、12 
  • B、10 
  • C、8 
  • D、6

正确答案:B

第2题:

A customer is planning to buy a two enclosure Power 770, and will implement 4 LPARs with the following requirements:Each LPAR must have a private, dedicated connection to the network.The adapter for this network connection must be hot-swappable.The customer wants to minimize the number of I/O slots used. Which of the following fulfills the customer requirements?()

  • A、Two dual-port PCIe adapters
  • B、A four-port PCIe Ethernet adapter
  • C、Four separate PCIe Ethernet adapters
  • D、Two embedded Integrated Virtual Ethernet adapters (IVE)

正确答案:C

第3题:

You are developing a Windows Communication Foundation (WCF) service that contains the following service contract.[ServiceContract()]public interface IPaymentService{ [OperationContract()] void RecordPayments(Person person);}public class Person{ ... }public class Employee : Person{ ... }public class Customer : Person{ ... }You need to ensure that RecordPayments can correctly deserialize into an Employee or a Customer object.What should you do?()

A. Add the following KnownType attribute to the Employee class and to the Customer class. [KnownType(GetType(Person))]

B. Implement the IExtensibleDataObject interface in the Person class.

C. Implement the IExtension(ofType(T)) interface in the Person class.

D. Add the following KnownType attributes to the Person class. [KnownType(GetType(Employee))] [KnownType(GetType(Customer))]


参考答案:D

第4题:

A medical customer wants to deploy around 8TB integrated storage on a BladeCenter.Which of the following should be discussed with this customer?()

  • A、SATA internal disks
  • B、iSCSI
  • C、Solid State Storage
  • D、SAS Internal Disk

正确答案:A

第5题:

Which of the following customer environments is addressed by IBM System Storage N series gateways?()

  • A、 a customer with CIFS, NFS and GPFS requirements 
  • B、 a customer wanting to natively implement Easy Tier 
  • C、 a customer who has large block sequential write requirements 
  • D、 a customer who needs to consolidate multiple storage controllers under one managementinterface 

正确答案:D

第6题:

A customer wants to update their system with the lasted drivers. Which the following tool you suggest?()

  • A、Bootable Media Creator
  • B、Advanced Settings Utility
  • C、UpdateXpress System Pack Installer
  • D、ServerGuide Scripting Toolkit

正确答案:C

第7题:

A customer wants to expand their current storage environment, but has floor space for only two machine frames or two racks. Their environment consists of IBM SAN Volume Controllers and IBM DS4000 systems. The DS4000 systems are at end of lease. The customer wants the maximum number of disks possible in two frames. Which of the following solutions is best for this customer?()

  • A、add one SVC
  • B、install one DS8700
  • C、install one DS8800
  • D、install one XIV system

正确答案:C

第8题:

During the implement phase, systems acceptance testing does which of the following for the customer? Select exactly 1 answer(s) from the following:()。

  • A、installation, configuration, and testing, as well as the commissioning of tools and processes in accordance with the operations implementation plan
  • B、provision of information regarding customer-specified design requirements and configuration
  • C、the migration of network services from an existing state to a future state in accordance with the migration plan
  • D、the provision of an objective means of measuring system operability and functionality

正确答案:D

第9题:

A customer runs an application on a supported 8-way x445.  The customer needs to monitor operations and wants to be alerted when problems arise.  Which TWO of the following can be configured in IBM Director Base Pack to monitor the customer’s operations?()

  • A、Fan operation
  • B、Bottleneck analysis
  • C、Power supply operations
  • D、Planned versus unplanned outages
  • E、Application predictive failure analysis

正确答案:A,C

第10题:

A banking customer plans to implement a BladeCenter H chassis. They plan for seven HS22 blades, six HX5 blades with MAX5, one 1U external Fibre Channel switch, and two 3U Fibre Channel storage devices with fourteen 146GB drives. Which of the following is the minimum amount of rack space required to implement the solution?()

  • A、32U 
  • B、25U 
  • C、22U 
  • D、21U

正确答案:B