A customer server has the maximum local storage installed. T

题目
单选题
A customer server has the maximum local storage installed. The customer plans to share this new storage with other servers. Which of the following provides that server additional storage?()
A

Add External Storage via EXP3000

B

Replace current storage with more dense drives

C

Add External Storage via SAN

D

Add storage expansion blade

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

An existing IBM customer has a few pSeries servers running DB2 on AIX in their environment.  The DB2 application contains the database for an order entry application.  An xSeries SQL database server replicating from DB2 is added for off-line analysis purposes.  The customer wants to know if consolidating the storage and centralized backup is possible. What are the options available to accomplish this?()

  • A、pSeries and xSeries use different file systems. Consolidating Storage and backup is not achievable.
  • B、Consolidation is possible by connecting pSeries local storage to the xSeries SQL server using the IXA adapter.
  • C、Storage consolidation can be achieved by connecting the pSeries and xSeries servers to a common DS4000 storage server.
  • D、Storage consolidation is only achievable when raw file systems are used by the databases and both servers run the same Linux file system (e.g., EXT3 or Reiser).

正确答案:C

第2题:

A customer server has the maximum local storage installed. The customer plans to share this new storage with other servers. Which of the following provides that server additional storage?()

  • A、Add External Storage via EXP3000
  • B、Replace current storage with more dense drives
  • C、Add External Storage via SAN
  • D、Add storage expansion blade

正确答案:C

第3题:

A customer is planning to upgrade two VMware ESX servers from 3.5 to 4.1 after recently installing a new XIV Storage System. Each server has 4 HBAs connected to redundant fabrics for a total of 4 paths per server to storage. The customer wants to increase the throughput available to the ESX servers.What configuration setting does the storage specialist need to highlight?()

A. increase the buffer credits on the HBAs

B. increase the number of device logins on the ESX servers

C. additional paths will be required between the servers and storage

D. multipath option on the ESX servers should be changed to round-robin


参考答案:D

第4题:

A customer currently buys HP ProLiant servers and EMC storage. The customer has encountered various problems getting certain servers to work with their storage.  Which of the following arguments can the Sales Specialist present to best position IBM? ()

  • A、IBM’s ServerProven program is a reference that assures a customer of compatibility with specific third-party products.
  • B、IBM sells other vendors’ products and will test compatibility with the customer’s products. 
  • C、B IBM’s storage division regularly tests their products with other vendors’ server products.  
  • D、IBM’s server division regularly tests their products with other vendors’ storage products.

正确答案:A

第5题:

A customer is planning to upgrade two VMware ESX servers from 3.5 to 4.1 after recently installing a new XIV Storage System. Each server has 4 HBAs connected to redundant fabrics for a total of 4 paths per server to storage. The customer wants to increase the throughput available to the ESX servers. What configuration setting does the storage specialist need to highlight?()

  • A、increase the buffer credits on the HBAs
  • B、increase the number of device logins on the ESX servers
  • C、additional paths will be required between the servers and storage
  • D、multipath option on the ESX servers should be changed to round-robin

正确答案:D

第6题:

A prospective customer has a SCSI installed. The new project requires a large high performance storage and tape network . The customer does not appear to understand the terminology and options of the fiber channel components of the solution. Further discussion confirms that the customers only has cursory knowledge of fiber channel and is not currently prepared to for the installation. What steps should be taken to make sure customer is satisfied with the solution? ()

  • A、Suggest a cloud network
  • B、Direct the customer to redbooks and white papers on FC technologies
  • C、Work with business partner to include Lab Service engagement to setup FC environment and perform knowledge transfer
  • D、Switch project to iSCSI

正确答案:C

第7题:

An existing IBM customer has some iSeries servers in their environment.  The customer is adding an x366 server with an RSA-II installed for their Microsoft Client/Server applications.  The customer wants to consolidate the storage and centralize the backup of the iSeries and xSeries platforms.  Which of the following will accomplish this?()

  • A、Share the data over the Ethernet LAN.
  • B、Install the IXA Adapter in the iSeries server.
  • C、Install the IXA Adapter in the xSeries server.
  • D、Attach both servers to an IXS switch.

正确答案:C

第8题:

An SMB customer requires a tower server with 2TB of internal storage. The customer has requested a low cost solution.  What IBM System x server would satisfy this criteria?()

  • A、x3250
  • B、x3200
  • C、x3650
  • D、x3400

正确答案:B

第9题:

A customer has an EMC Symmetrix DMX-4 installed. The disk subsystem is coming off lease. The customer is considering an IBM System Storage DS8800.  What is a key advantage of the  DS8800()

  • A、The DS8800 has a higher disk RPM than the Symmetrix DMX-4
  • B、The DS8800 has higher capacity with more efficient footprint than the Symmetrix DMX-4
  • C、The DS8800 supports FlashCopy for internal array replication
  • D、The DS8800 supports external virtualization

正确答案:B

第10题:

A customer has a very large number of physical Windows-based servers and no centralized storage. Which technology solution will help the customer to reduce the footprint of their existing server estate?()

  • A、z/OS, DS8000, TSM
  • B、TSM, LTO-5, VMware
  • C、System x, VMware, XIV
  • D、System p, VMware, DS5000

正确答案:C

更多相关问题