第1题:
A. A job chain can contain a nested chain of jobs.
B. The jobs in a job chain cannot have more than one dependency.
C. A job of the CHAIN type can be run using event-based or time-based schedules.
D. The jobs in a job chain can be executed only by using the events generated by the Scheduler
第2题:
How can a Job with EXEC as Internal Status be stopped in the Job Scheduling Console?()
第3题:
A. The job is enabled by default after creation
B. The job is automatically dropped after the end date
C. The job executes with the privileges of the user SYS
D.
第4题:
You want to schedule a job to rebuild all indexes on the SALES table after the completion of a bulk load operation. The bulk load operation must also be a scheduled job that executes as soon as the first file that contains data arrives on the system. How would you create these jobs?()
第5题:
Using the Tivoli Dynamic Workload Console, what are two ways to change the priority of a job?()
第6题:
You would be using mainly English in this job. Can you manage English conversation?
第7题:
While creating a job class using the DBMS_SCHEDULER package, you set the logging level to LOGGING_RUNS. What would be the impact of this setting?()
第8题:
You want to schedule a job to rebuild all indexes on the SALES table after the completion of a bulk load operation. The bulk load operation must also be a scheduled job that executes as soon as the first file that contains data arrives on the system.How would you create these jobs?()
A. Create both jobs by using events raised by the scheduler
B. Create both jobs by using events raised by the application
C. Create a job to rebuild indexes by using events arised by the application and then create another job to perform bulk load by using events raised by the scheduler
D. Create a job to rebuild indexes by using events arised by the Scheduler and then create another job to perform bulk load by using events raised by the application
第9题:
Using Job Scheduling Console, how can the external successor chain be viewed when a job needs to be canceled?()
第10题:
What is the danger associated with stopping a running job by using the STOP_JOB procedure?()