单选题An IBM Tivoli Workload Scheduler administrator finds that most of  the job streams are carried forward during each production day.  Which  action should the administrator take to ensure that only a  few job streams need to be carried forward? ()A  chan

题目
单选题
An IBM Tivoli Workload Scheduler administrator finds that most of  the job streams are carried forward during each production day.  Which  action should the administrator take to ensure that only a  few job streams need to be carried forward? ()
A

 change start of day

B

 disable the Carry Forward option

C

 cancel all job streams before start of day

D

 Administrator does not have to take any action

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

While creating a job class using the DBMS_SCHEDULER package, you set the logging level to LOGGING_RUNS. What would be the impact of this setting?()

  • A、 Oracle Scheduler would write detailed information to the job log for each run of each job in the job class.
  • B、 Oracle Scheduler would write detailed information to the job log for the first run of each job in the job class.
  • C、 Oracle Scheduler would write detailed information to the job log for each run of only the first job in the job class.
  • D、 Oracle Scheduler would write detailed information for all operations performed on all jobs in the job class.

正确答案:A

第2题:

Using the Tivoli Dynamic Workload Console, what are two ways to  change the priority of a job?()

  • A、 Open the "Set Priority" panel from the job properties.
  • B、 Change the priority of the job stream that contains the job.
  • C、 Select the corresponding action from the Monitor jobs task panel.
  • D、 Open the job stream properties and drill down to the job priority  panel.
  • E、 The priority of a job can only be changed from the Workload  Designer.

正确答案:A,C

第3题:

You notice that the elapsed time for an important database scheduler Job is unacceptably long.The job belongs to a scheduler job class and window.Which two actions would reduce the job‘s elapsed time?()

A. Increasing the priority of the job class to which the job belongs

B. Increasing the job‘s relative priority within the Job class to which it belongs

C. Increasing the resource allocation for the consumer group mapped to the scheduler job‘s job class within the plan mapped to the scheduler window

D. Moving the job to an existing higher priority scheduler window with the same schedule and duration

E. Increasing the value of the JOB_QUEUE_PROCESSES parameter

F. Increasing the priority of the scheduler window to which the job belongs


参考答案:B, C

第4题:

An IBM Tivoli Workload Scheduler administrator finds that most of  the job streams are carried forward during each production day.  Which  action should the administrator take to ensure that only a  few job streams need to be carried forward? ()

  • A、 change start of day
  • B、 disable the Carry Forward option
  • C、 cancel all job streams before start of day
  • D、 Administrator does not have to take any action

正确答案:A

第5题:

One of the schedulers has submitted an ad hoc job to list a particular directory. Which command should be used to view the output  of the ls command through IBM Tivoli Workload Scheduler? ()

  • A、 conman "sj CPU#jobs.ls;joblog"
  • B、 conman "sj CPU#jobs.ls;stdlist"
  • C、 jobman "showjoblog CPU#jobs.ls"
  • D、 jobman "showjoblog CPU#jobs.ls;stdlist"

正确答案:B

第6题:

What are two circumstances for which it may be advisable to use the  silent uninstallation method instead of an interactive method?()

  • A、 The Administrator is unable to successfully export DISPLAY to a  remote server.
  • B、 IBM Tivoli Workload Scheduler is installed on a server for which  there is no console access.
  • C、 DNS is not working properly and the server cannot be accessed  remotely to run the uninstallation script.
  • D、 TCP on the server on which IBM Tivoli Workload Scheduler is  installed is configured for half-duplex rather than full-duplex.
  • E、 The remote IBM Tivoli Workload Scheduler server is multi-homed, thus  the return connection to IBM Tivoli Workload Scheduler cannot be  established thereby requiring the use of the silent  uninstaller.

正确答案:A,B

第7题:

Which IBM Tivoli Workload Scheduler report will provide the job  history?()

  • A、 rep2
  • B、 rep3
  • C、 rep7
  • D、 rep8

正确答案:C

第8题:

Preventive maintenance______.

A.should not be carried out during the watches

B.can only be carried out in port

C.is a kind of maintenances carried out prior to the occurrence

D.is a kind of maintenances carried out after the occurrence


正确答案:C

第9题:

What is the location for the application server scripts? ()

  • A、 wastools directory in IBM Tivoli Workload Scheduler bin directory
  • B、 wastools directory in IBM Tivoli Workload Automation home directory
  • C、 appserver directory in IBM Tivoli Workload Scheduler parent  directory
  • D、 appserver directory in IBM Tivoli Workload Automation home directory

正确答案:B

第10题:

When using IBM Tivoli Monitoring Universal Agents monitors, which  three IBM Tivoli Workload Scheduler processes can be monitored by  default? ()

  • A、 reptr
  • B、 writer
  • C、 netman
  • D、 monman
  • E、 batchman
  • F、 appservman

正确答案:C,D,E

更多相关问题