单选题Which command is issued on an IBM Tivoli Workload Scheduler master  to determine link status and collect into a user created report? ()A  netstat -rn  B  conman sc  C  conman show links  D  conman disp lnk status

题目
单选题
Which command is issued on an IBM Tivoli Workload Scheduler master  to determine link status and collect into a user created report? ()
A

 netstat -rn > 

B

 conman sc > 

C

 conman show links > 

D

 conman disp lnk status > 

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

A network administrator would like to view detailed interface status, properties, statistics, errors,and CoS packet counters.Which operational command will display this information?()

  • A、show interfaces extensive
  • B、show interfaces
  • C、show configuration interfaces
  • D、show interface status

正确答案:A

第2题:

What are two circumstances for which it may be advisable to use the  silent uninstallation method instead of an interactive method?()

  • A、 The Administrator is unable to successfully export DISPLAY to a  remote server.
  • B、 IBM Tivoli Workload Scheduler is installed on a server for which  there is no console access.
  • C、 DNS is not working properly and the server cannot be accessed  remotely to run the uninstallation script.
  • D、 TCP on the server on which IBM Tivoli Workload Scheduler is  installed is configured for half-duplex rather than full-duplex.
  • E、 The remote IBM Tivoli Workload Scheduler server is multi-homed, thus  the return connection to IBM Tivoli Workload Scheduler cannot be  established thereby requiring the use of the silent  uninstaller.

正确答案:A,B

第3题:

Which command will allow you to quickly determine the administrative status of all interfaces on a Junos device?()

A. show interfaces status

B. show interfaces summary

C. show interfaces terse

D. show interfaces admin


参考答案:C

第4题:

What is the correct command to stop the currently executing job  "test" in JOBS job stream on a local machine?()

  • A、 conman "k test"
  • B、 conman "cj test"
  • C、 conman "k jobs.test"
  • D、 conman "cj jobs.test"

正确答案:C

第5题:

Which IBM Tivoli Workload Scheduler report will provide the job  history?()

  • A、 rep2
  • B、 rep3
  • C、 rep7
  • D、 rep8

正确答案:C

第6题:

Which command displays the IPNCP parameters for all connected PPPoA subscribers?()

  • A、show users
  • B、show subscriber
  • C、show ppp interface
  • D、show ppp interface status ip

正确答案:D

第7题:

Which two commands are used to migrate IBM Tivoli Workload Scheduler  to version 8.5 on a UNIX system?()

  • A、 launch.sh
  • B、 wdinstspb
  • C、 SETUP.bin
  • D、 twsinst -migrate
  • E、 SETUP.bin -silent

正确答案:C,E

第8题:

A network administrator would like to view detailed interface status, properties, statistics, errors,and CoS packet counters.Which operational command will display this information?()

A. show interfaces extensive

B. show interfaces

C. show configuration interfaces

D. show interface status


参考答案:A

第9题:

Which statement is true about a DB2 user that is to be used as the database user for IBM Tivoli Access Manager for Enterprise Single Sign-On IMS Server?()

  • A、The database user must be created using DB2 Control Center.
  • B、The database user must be created using the DB2 Command Line Processor.
  • C、The database user may be created using DB2 Control Center or DB2 Command Line Processor.
  • D、The database user must be created by IBM Tivoli Access Manager for Enterprise Single Sign-On V8.0.1 IMS Installer.

正确答案:C

第10题:

One of the schedulers has submitted an ad hoc job to list a particular directory. Which command should be used to view the output  of the ls command through IBM Tivoli Workload Scheduler? ()

  • A、 conman "sj CPU#jobs.ls;joblog"
  • B、 conman "sj CPU#jobs.ls;stdlist"
  • C、 jobman "showjoblog CPU#jobs.ls"
  • D、 jobman "showjoblog CPU#jobs.ls;stdlist"

正确答案:B

更多相关问题