问题:单选题What should be done if a company decides to stop doing business with a vendor? ()ANotify buyers using Workflow.BDelete the Company Master record.CSet the Company record status to DISQUAL.DCheck the Disqualified Vendor check box on the Company record.
查看答案
问题:单选题Where are the receipt of Services and Materials processed in IBM Maximo Asset Management V6.2 (IMAM)? ()AThe Receipt of Services and Materials are processed in the Receiving application.BServices are rendered and Materials are received in the Purchase Order application.CReceipts of Services and Materials are systematically processed in IMAM transitionally.DServices are rendered and Materials are received using the Issues and Transfer application.
问题:单选题What should be done to add lines from a Purchase Request (PR) to a Requests for Quotation (RFQ)? ()AHyperlink to the PR tab and add each line.BGo to the Vendors tab in the RFQ application and click Create PO.CGo to the Quotation tab in the RFQ application and select RFQ lines.DSelect Action in the RFQ application and click Copy PR line item to RFQ.
问题:单选题Which menu option must be used to grant a user the authority to add or remove users to one or more Security Groups?()ASecurity ControlsBDatabase AccessCSet Security ProfileDAuthorize Group Reassignment
问题:单选题The Client has requested that once Terms and Conditions (Ts Cs) are attached to another record, the Ts Cs should be unchangeable. How is this appropriately accomplished?()AIn the Contracts application, delete the Ts Cs from the record and enter a new row.BIn the application using the specific Ts Cs, rename the Ts Cs and approve the record.CIn the Terms and Conditions Application, uncheck the Editable box on the newly created term.DIn the Terms and Conditions Application, change the status of the newly created term to Approved.
问题:多选题Which two applications can be used to view actual costs for labor, materials, services, and tools?()ALabor ReportingBQuick ReportingCWork Order TrackingDAssignment ManagerEWork Order Management
问题:单选题Which status will prevent an invoice from being cancelled? ()AHoldBEnteredCApprovedDWaiting for Approval
问题:单选题What is the maximum value (as a percentage of total cost) that an item identified as condition-coded can have?()A25%B50%C75%D100%
问题:单选题At which level do Commodity Codes exist within IBM Maximo Asset Management V6.2? ()ASet levelBSite levelCSystem levelDOrganization level
问题:多选题Which two applications can be used by a user to report emergency work, if the user at least wants to report downtime, classify the request, and report actuals?()AJob PlanBQuick ReportingCLabor ReportingDWork Order TrackingEAssignment Manager
问题:单选题Can an item balance ever be allowed to be negative? ()AneverBalwaysCdepends on which itemDdepends on if it is allowed in the Inventory Default settings
问题:单选题In IBM Maximo Asset Management V6.2, what does the Purchase Orders applications Distribute Costs action do?()ADistribute the line item cost among all lines.BDistribute the line item cost among all direct issue lines.CDistribute the line item cost among multiple GL accounts.DDistribute the purchase order cost among multiple GL accounts.
问题:单选题Which statement is true about items that have been assembled into a kit? ()AOnly rotating items can be part of a kit.BKits can be assembled from lotted items.CKits can be assembled from items in different storerooms.DItems that have been assembled into kits do not appear in item balances.
问题:单选题In order to use the item records at the site level, to what must the item be added? ()AAssetBLocationCStoreroomDRotating Asset
问题:单选题What does the ABC designation include for inventory items? ()AQuantity reserved in stockBQuantity expired for a particular LotCCount Frequency in number of daysDActivity Based Costing in capital dollars
问题:单选题What must be created before populating the Tools application? ()AItem SetsBItem Master OwnerCVendors for the ItemsDStoreroom assignment