On both VIO servers, modify the inittab making chdev the last command, so that they will start during VIO server reboot.
On both VIO servers, change the following parameters and reboot each of them in turn hcheck_interval =60 hcheck_mode=interactive
On client logical partition, modify the inittab making chdev the last command, so that they will start during client partition reboot.
On the client logical partition, change the following parameters and reboot the client hcheck_interval =60 hcheck_mode=interactive
第1题:
Companycom will be using Virtual IO Server to share Ethernet adapters. What can be done to prevent network failure of the client if a Virtual IO Server goes down?()
第2题:
While using virtualization to share SAN adapters on a server, how does Node Port ID Virtualization (NPIV) differ from Virtual SCSI (vSCSI) related to the use of multipathing software?()
第3题:
Company.com has an EMC disk array and would like to connect it to a Virtual I/O Server on a pSeries p5-520. How can the EMC device drivers be installed?()
第4题:
What type of configuration can provide the best availability in a Virtual IO Server environment?()
第5题:
A customer uses third party storage and would like to connect it to a Virtual IO server on a Power 550. How can the third party storage device drivers be installed? ()
第6题:
A customer has an entry level Power System that is currently partitioned and managed by a Hardware Management Console (HMC). For operational reasons, it must be disconnected from the HMC and configured as a new development system. How should the customer proceed to implement PowerVM Express and Integrated Virtualization Manager (IVM) on this Power System? ()
第7题:
After rebooting one Virtual IO (VIO) server in a redundant environment, the following command output from the client partition shows that the path to the shared disk from the rebooted VIO server remains in a failed state. Vio_client1# lspath Failed hdisk0 vscsi0 Enabled hdisk0 vscsi1 What must the administrator do to ensure that the path is automatically restored when a VIO server is brought back into service? ()
第8题:
A system is being designed with many LPARs which will be clients of dual VIO Servers. The VIO Servers must be redundant so that, in the event of scheduled maintenance, the clients do not need to be shut down. Which of these strategies could be used to ensure that the client LPARs continue to be able to use the network in the event of a VIO Server being shut down?()
第9题:
Best practices would have no single point of failure between mirrored resources. In setting up virtual, internal boot disks for two client LPARs, how would this be accomplished?()
第10题:
Company.com has a p5-570 with an application running on each of three Micro-Partitions. The disk I/O is shared through a VIO server. A technical specialist has been asked to upgrade the VIO server. Which of the following procedures should be taken to maintain the integrity of the partitions?()