单选题A customer has a requirement for a server to run Windows Server 2003 Enterprise Edition and Exchange 2003 Enterprise Edition. It has been determined that 4GB RAM will be needed.  The customer is trying to decide between the two following configurations

题目
单选题
A customer has a requirement for a server to run Windows Server 2003 Enterprise Edition and Exchange 2003 Enterprise Edition. It has been determined that 4GB RAM will be needed.  The customer is trying to decide between the two following configurations:   (1)An IBM xSeries x366 with 4 Xeon MP processors and 4 x 1GB memory DIMMs.       (2)An IBM xSeries x445 with 4 Xeon MP processors and 8 x 1GB memory DIMMs.  Which question should be asked to guide the customer in selecting the correct memory configuration?()
A

Is rack space an issue?

B

Is there a high cache-hit ratio?

C

Is this a mission-critical application?

D

Are there plans to expand the memory to 8GB in the future?

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

A company wants to replace an existing UNIX database server with a new application running on Microsoft SQL Server.  Sizing analysis shows that a system with at least eight Xeon MP processors and 24GB RAM will be required for the central database server. Which of the following will meet the requirements at the lowest cost?()

  • A、8-way x445 with Microsoft Windows Server 2003 Standard Edition
  • B、8-way x445 with Microsoft Windows Server 2003 Datacenter Edition
  • C、8-way x445 with Microsoft Windows Server 2003 Enterprise Edition
  • D、16-way x445 with VMWare ESX with SMP and Windows Server 2003 Standard Edition VMs

正确答案:C

第2题:

A customer needs to install a rack with six of the x3650 M3 servers with the standard line cords. Each server has redundant power supplies. Which of the following meets this requirement?()

  • A、 Two of DPI C13 Enterprise PDU 39Y8941
  • B、 One of DPI Universal Rack PDU 39Y8951
  • C、 One of DPI C13 Enterprise PDU 39Y8941
  • D、 Two of DPI C19 Enterprise PDU 39Y8948

正确答案:A

第3题:

You have a server named Server1 that runs Windows Server 2003 Standard Edition Service Pack 2 (SP2).Server1 contains 4 GB of RAM and four processors.Users report that Server1 is slow. You run a performance report. The report displays the results shown in the following table.You need to improve the performance of Server1.What should you do?()

A. Add 2 GB of RAM and enable hyper-threading.

B. Add 2 GB of RAM and upgrade to Windows Server 2003 Enterprise Edition.

C. Add two processors and enable hyper-threading.

D. Add two processors and upgrade to Windows Server 2003 Enterprise Edition.


参考答案:D

第4题:

A customer wants to implement a clustered database solution on their existing x445 servers.  A minimum of four nodes must participate in the cluster, and the customer wishes to use open standards.  Which of the following best satisfies their requirements?()

  • A、Novell NetWare Cluster Services
  • B、Red Hat Enterprise Linux Cluster Suite
  • C、Microsoft Windows 2003 Server with MSCS
  • D、Microsoft Windows 2003 Enterprise Edition

正确答案:B

第5题:

A customer needs a new database server.  Their third-party application requires Microsoft SQL Server.  They have 100 users who will login to the network and store their data files on the network server.  They will also require the server to be an email server and to deploy a central antivirus solution.  Which of the following network operating systems would satisfy these requirements?()

  • A、SuSE Linux Enterprise 9
  • B、Red Hat Linux Advanced Server 3
  • C、Microsoft Windows 2003 Server Web Edition
  • D、Microsoft Windows 2003 Server Standard Edition

正确答案:D

第6题:

A customer has a requirement for a server to run Windows Server 2003 Enterprise Edition and Exchange 2003 Enterprise Edition. It has been determined that 4GB RAM will be needed.  The customer is trying to decide between the two following configurations:   (1)An IBM xSeries x366 with 4 Xeon MP processors and 4 x 1GB memory DIMMs.       (2)An IBM xSeries x445 with 4 Xeon MP processors and 8 x 1GB memory DIMMs.  Which question should be asked to guide the customer in selecting the correct memory configuration?()

  • A、Is rack space an issue?
  • B、Is there a high cache-hit ratio?
  • C、Is this a mission-critical application?
  • D、Are there plans to expand the memory to 8GB in the future?

正确答案:C

第7题:

A customer has just purchased six x346 servers running Windows 2003 Web Edition.They are expecting to add six additional x346’s in three months.They have a requirement to automatically deploy the current server image upon the new servers. What TWO actions are required to complete this task?()

  • A、Ensure Director Agent is installed on the new servers.
  • B、Ensure a DHCP Sever is installed and configured in the environment.
  • C、Ensure Server Plus Pack option has been installed and configured.
  • D、Ensure Software Distribution has been installed on the IBM Director Server and an image has been created.
  • E、Ensure Remote Deployment Manager has been installed on the IBM Director Server and an image has been created.

正确答案:B,E

第8题:

A customer has a mixed environment of AIX on POWER4 and POWER5, and x86 based systems running a supported distribution of Linux. There is a total of 7 partitions and three standalone x86 servers. The customer wants to consolidate their applications using a single 4-core POWER6 server.  What is the minimum PowerVM edition that supports the customer requirement?()

  • A、 PowerVM Lx86
  • B、 PowerVM Express Edition
  • C、 PowerVM Standard Edition
  • D、 PowerVM Enterprise Edition

正确答案:C

第9题:

A customer has a key application running in a logical partition on a POWER5 system. The customer wants the ability to run the application with minimal down time using Live Partition Mobility.  Which of the following is the minimum PowerVM edition and hardware configuration that will support the customer requirement?()

  • A、 PowerVM Standard Edition on POWER6 hardware
  • B、 PowerVM Standard Edition with POWER5 hardware 
  • C、 PowerVM Enterprise Edition with POWER6 hardware
  • D、 PowerVM Enterprise Edition with POWER5 hardware

正确答案:C

第10题:

A Customer has a proprietary server deployment solution that uses a combination of disk imaging and application pushing technology. They need to get a working Windows 2003 image for their new servers as soon as possible for deployment with their provisioning system. Which of the following methods can achieve this?()

  • A、UseServerGuide to install Windows 2003rchase PowerVM Standard Edition for the entire system
  • B、Install Windows 2003 using the F6 supply Mass Storage Controller option
  • C、Replace Customer’s deployment solution with Tivoli Provisioning Manager for OS Deployment Director Edition
  • D、Deploy Customer’s existing image and useUXSPi to update IBM specific drivers

正确答案:A

更多相关问题