Is rack space an issue?
Is there a high cache-hit ratio?
Is this a mission-critical application?
Are there plans to expand the memory to 8GB in the future?
第1题:
A company wants to replace an existing UNIX database server with a new application running on Microsoft SQL Server. Sizing analysis shows that a system with at least eight Xeon MP processors and 24GB RAM will be required for the central database server. Which of the following will meet the requirements at the lowest cost?()
第2题:
A customer needs to install a rack with six of the x3650 M3 servers with the standard line cords. Each server has redundant power supplies. Which of the following meets this requirement?()
第3题:
You have a server named Server1 that runs Windows Server 2003 Standard Edition Service Pack 2 (SP2).Server1 contains 4 GB of RAM and four processors.Users report that Server1 is slow. You run a performance report. The report displays the results shown in the following table.You need to improve the performance of Server1.What should you do?()
A. Add 2 GB of RAM and enable hyper-threading.
B. Add 2 GB of RAM and upgrade to Windows Server 2003 Enterprise Edition.
C. Add two processors and enable hyper-threading.
D. Add two processors and upgrade to Windows Server 2003 Enterprise Edition.
第4题:
A customer wants to implement a clustered database solution on their existing x445 servers. A minimum of four nodes must participate in the cluster, and the customer wishes to use open standards. Which of the following best satisfies their requirements?()
第5题:
A customer needs a new database server. Their third-party application requires Microsoft SQL Server. They have 100 users who will login to the network and store their data files on the network server. They will also require the server to be an email server and to deploy a central antivirus solution. Which of the following network operating systems would satisfy these requirements?()
第6题:
A customer has a requirement for a server to run Windows Server 2003 Enterprise Edition and Exchange 2003 Enterprise Edition. It has been determined that 4GB RAM will be needed. The customer is trying to decide between the two following configurations: (1)An IBM xSeries x366 with 4 Xeon MP processors and 4 x 1GB memory DIMMs. (2)An IBM xSeries x445 with 4 Xeon MP processors and 8 x 1GB memory DIMMs. Which question should be asked to guide the customer in selecting the correct memory configuration?()
第7题:
A customer has just purchased six x346 servers running Windows 2003 Web Edition.They are expecting to add six additional x346’s in three months.They have a requirement to automatically deploy the current server image upon the new servers. What TWO actions are required to complete this task?()
第8题:
A customer has a mixed environment of AIX on POWER4 and POWER5, and x86 based systems running a supported distribution of Linux. There is a total of 7 partitions and three standalone x86 servers. The customer wants to consolidate their applications using a single 4-core POWER6 server. What is the minimum PowerVM edition that supports the customer requirement?()
第9题:
A customer has a key application running in a logical partition on a POWER5 system. The customer wants the ability to run the application with minimal down time using Live Partition Mobility. Which of the following is the minimum PowerVM edition and hardware configuration that will support the customer requirement?()
第10题:
A Customer has a proprietary server deployment solution that uses a combination of disk imaging and application pushing technology. They need to get a working Windows 2003 image for their new servers as soon as possible for deployment with their provisioning system. Which of the following methods can achieve this?()