Transfer the file to the FC module using FTP; use Telnet to the FC module to start the update
Use Telnet to the AMM to transfer the file using TFTP; start the update
Transfer the file to the FC module using Secure Copy Protocol (SCP);use Telnet to the FC module to start the update
Start the update and enter FC module IP address when prompted
第1题:
A customer’s support technician finished installing their new x366 server running Windows 2003 Enterprise Server and the IBM Director agent. The customer applied the latest BIOS and firmware drivers available on the Web for the system. The problem is that the x366 runs for a few minutes and then reboots itself. Which of the following should be checked first?()
第2题:
Which of the following does an out-of-memory error indicate on a printer?()
第3题:
A. A faulty memory module in the printer.
B. A postscript print job has been sent to the printer.
C. A large print job has been sent to the printer.
D. The printer firmware needs to be updated.
第4题:
Which is a supported method to upgrade firmware on an IBM Power Systems 570?()
第5题:
Which is a supported method to upgrade firmware on an IBM Power Systems 570?()
第6题:
Which of the following steps does a customer use to upgrade the firmware on the AMM to the latest level?()
第7题:
By default, who is responsible for firmware and software updates of an SVC solution? ()
第8题:
A customer has a BladeCenter H chassis with a single AMM. The AMM is defective. Which of the following is the method to backup the existing AMM so the new AMM automaticlally picks up the configuration? ()
第9题:
A retail customer installs a BladeCenter into an existing 10/100 Ethernet network. Due to cost considerations, the customer uses Copper Pass-thru Modules. After installing this solution, the customer finds that they have no network connectivity. Which of the following at is causing the problem?()
第10题:
A customer wants to install an IBM BladeCenter infrastructure but is concerned about the cost of the internal fibre switches. Consequently. the customer wants to use the Optical Pass-Thru Module (OPM). What TRUE statement should be mentioned to the customer regarding the OPM?()