Configure a 2 node x3950 X5
Customer needs a System p server to support Oracle applications
Download the Oracle eBusiness sizing questionnaire from IBM, fill out with customer and submit to IBM for System x sizing
Configure a system that meets the minimum requirements
第1题:
A customer is concerned about rising power costs, and the limited space they have left in the computer room. They have been doing some research into virtualization and would like to know if they should pursue this solution. Which of the following architectural features should be discussed with them?()
第2题:
You have a junior sales representative working with your largest customer, who needs to build an entry System x Server hardware solution. Which IBM resource should the junior sales representative use? ()
第3题:
● Which statement about the preliminary design stage of a software development project is true? (75) .
(75)
A.The preliminary design is an internal document used only by programmers
B.The preliminary design is the result of mapping product requirements info software and hardware functions
C.The preliminary design of the product comes from the requirement specification
D.The developers produce the preliminary design by defining the software structure in enough detail to permit coding
第4题:
A customer is looking at an Oracle E-Business solution. They would like to know what hardware they will need for the solution. They have some preliminary information from Oracle, including hardware requirements and specifics for their environment. Which of the following should be done next?()
第5题:
A customer is looking at an Oracle eBusiness solution. They would like to know what hardware they will need for the solution. They have some preliminary information from Oracle, including hardware requirements and specifics for their environment. Which of the following should be done next?()
第6题:
You have successfully sold and installed your customer’s System x solution. Sometimes, the overall succeed of a sale depends on how well you have trained your customer to support their new hardware. Please consider the following tools. Which one would be the best for protectively determining a server outage, and contacting the system administrator about the outage?()
第7题:
When designing a single tier AIX database solution for a customer, what other technical specialist would be most instrumental in putting together a total solution and why?()
第8题:
Which of the following BEST explains the purpose of an HCL?()
第9题:
A Sales Specialist receives an email from a customer, requesting information on IBM’s best Server Consolidation solution. How should the Sales Specialist proceed? ()
第10题:
A customer would like to implement an IBM System Storage DS8000 solution. A Capacity Magic study has determined that 500 drives of 450 GB are required to meet the customer’s capacity requirements. Limited space is available for additional systems in the data center. Which solution best meets the customer’s requirements()