多选题With which two does a scheduler map associate? ()ASchedulerBBA ClassifierCQueuesDInterface

题目
多选题
With which two does a scheduler map associate? ()
A

Scheduler

B

BA Classifier

C

Queues

D

Interface

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

When configuring a scheduler map, which two are referenced?()

A.Forwarding Class

B.Scheduler

C.Rewrite Rules

D.Priority


参考答案:A, B

第2题:

Which two statements apply to policy scheduling?() (Choose two.)

  • A、An individual policy can have only one scheduler applied.
  • B、You must manually configure system-time updates.
  • C、Multiple policies can use the same scheduler.
  • D、Policies that do not have schedulers are not active.

正确答案:A,C

第3题:

Which three components does the Scheduler use for managing tasks within the Oracle environment?()

A. a job

B. a program

C. a schedule

D. a PL/SQL procedure


参考答案:A, B, C

第4题:

Which three components does the Scheduler use for managing tasks within the Oracle environment?()

  • A、 a job
  • B、 a program
  • C、 a schedule
  • D、 a PL/SQL procedure

正确答案:A,B,C

第5题:

With which two does a scheduler map associate? ()

  • A、Scheduler
  • B、BA Classifier
  • C、Queues
  • D、Interface

正确答案:C,D

第6题:

With which two does a scheduler map associate? ()

A.Scheduler

B.BA Classifier

C.Queues

D.Interface


参考答案:C, D

第7题:

When configuring a scheduler map, which two are referenced?()

  • A、Forwarding Class
  • B、Scheduler
  • C、Rewrite Rules
  • D、Priority

正确答案:A,B

第8题:

You notice that the elapsed time for an important database scheduler Job is unacceptably long.The job belongs to a scheduler job class and window.Which two actions would reduce the job‘s elapsed time?()

A. Increasing the priority of the job class to which the job belongs

B. Increasing the job‘s relative priority within the Job class to which it belongs

C. Increasing the resource allocation for the consumer group mapped to the scheduler job‘s job class within the plan mapped to the scheduler window

D. Moving the job to an existing higher priority scheduler window with the same schedule and duration

E. Increasing the value of the JOB_QUEUE_PROCESSES parameter

F. Increasing the priority of the scheduler window to which the job belongs


参考答案:B, C

第9题:

Which three components does the Scheduler use for managing tasks within the Oracle environment? ()(Choose three.)

  • A、a job
  • B、a program
  • C、a schedule
  • D、a PL/SQL procedure

正确答案:A,B,C

第10题:

You notice that the elapsed time for an important database scheduler Job is unacceptably long. The job belongs to a scheduler job class and window. Which two actions would reduce the job's elapsed time?()

  • A、Increasing the priority of the job class to which the job belongs
  • B、Increasing the job's relative priority within the Job class to which it belongs
  • C、Increasing the resource allocation for the consumer group mapped to the scheduler job's job class within the plan mapped to the scheduler window
  • D、Moving the job to an existing higher priority scheduler window with the same schedule and duration
  • E、Increasing the value of the JOB_QUEUE_PROCESSES parameter
  • F、Increasing the priority of the scheduler window to which the job belongs

正确答案:B,C