单选题An administrator is creating a redundant environment for a current data center. A backup site must be available if the entire data center site should become unavailable. To reduce costs, this backup site does not need to be up and running at all times 

题目
单选题
An administrator is creating a redundant environment for a current data center. A backup site must be available if the entire data center site should become unavailable. To reduce costs, this backup site does not need to be up and running at all times ready for failover. It must contain equipment and the ability to restore data from the data center.  Which of the following site types should be considered to meet these requirements? ()
A

 Hot site

B

 Warm site

C

 Cold site

D

 Active failover site

参考答案和解析
正确答案: B
解析: 暂无解析
如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

Which of the following is the MOST important data retention consideration when creating a backup system?()

  • A、Utilizing disk-to-disk clustering and hot site replication
  • B、If the GFS backup system will cover all potential data breaches
  • C、The process to move the data backup to an offsite location
  • D、The individual laws and legal requirements of the data

正确答案:D

第2题:

A failure of the primary data center has occurred.  A warm site is available for use.  Which of the following should be done FIRST to bring the critical applications online?()

  • A、Run cabling and power to the warm site.
  • B、Restore data to the equipment.
  • C、Transfer all data tapes over to the warm site.
  • D、Restore least critical applications online to test to make sure the site is functioning.

正确答案:B

第3题:

An administrator is creating a redundant environment for a current data center. A backup site must be available if the entire data center site should become unavailable. To reduce costs, this backup site does not need to be up and running at all times ready for failover. It must contain equipment and the ability to restore data from the data center.Which of the following site types should be considered to meet these requirements?()

A. Hot site

B. Warm site

C. Cold site

D. Active failover site


参考答案:B

第4题:

A customer has a requirement for Disaster Recovery for compliance within their industry. Theyhave an RPO of 4 hours and an RTO of 24 hours. Cost is a consideration. What is the most costeffective DR implementation?()

  • A、a disk-to-disk backup solution keeping all storage in the data center
  • B、a backup solution that includes magnetic tape that is shipped to an off-site storage facility
  • C、a less powerful copy environment at a hot site with asynchronous mirroring and cluster technology
  • D、an exact copy of the primary environment at a hot site with remote mirroring and cluster technology

正确答案:B

第5题:

A tape drive containing a jammed tape must be taken off-site to be repaired. Which of the following should be considered FIRST?()

  • A、Downtime necessary to reinstall the repaired drive
  • B、Data security policies and procedures
  • C、Potential cooling problems due to the missing drive
  • D、Redundant or replacement data backup solutions

正确答案:B

第6题:

An administrator is creating a redundant environment for a current data center. A backup site must be available if the entire data center site should become unavailable. To reduce costs, this backup site does not need to be up and running at all times ready for failover. It must contain equipment and the ability to restore data from the data center. Which of the following site types should be considered to meet these requirements?()

  • A、Hot site
  • B、Warm site
  • C、Cold site
  • D、Active failover site

正确答案:B

第7题:

An administrator is creating a redundant environment for a current data center. A backup site must be available if the entire data center site should become unavailable. To reduce costs, this backup site does not need to be up and running at all times ready for failover. It must contain equipment and the ability to restore data from the data center.  Which of the following site types should be considered to meet these requirements? ()

  • A、 Hot site
  • B、 Warm site
  • C、 Cold site
  • D、 Active failover site

正确答案:B

第8题:

You are the network administrator for All network servers run Windows Server 2003.You install Software Update Services (SUS) on one server. You configure the following settings:1. Do not use a proxy server for Internet access.2. Synchronize directly from the Microsoft Windows Update servers.3. Automatically approve new versions of previously approved updates.4. Save updates in a local folder.You perform a manual synchronization.Now you need to back up the critical information that is related to your installation of SUS.What should you do?()

A. First, use the Backup utility to back up the System State data. Then, use the IIS administration tool to back up the default Web site.

B. First, use the IIS administration tool to back up the default Web site. Then, use the Backup utility to back up the System State data.

C. First, use the IIS administration tool to back up the IIS metabase. Then, use the Backup utility to back up the IIS metabase file, the default Web site, and the content storage location.

D. First, use the Backup utility to back up the IIS metabase file, the default Web site, and the content storage location. Then, use the IIS administration tool to back up the IIS metabase.


参考答案:C

第9题:

A customer has one IBM System Storage DS8700 in their main data center with one DS6800 at a secondary site. They are using the Global Copy feature between the sites. They want to bring up a test image at the secondary site using the primary site data. Which sequence of actions will properly bring up the secondary site?()

  • A、bring up the secondary site on the target disks
  • B、suspend and bring up the secondary site on the target disks
  • C、perform a FlashCopy and bring up the secondary site on the target disks
  • D、"go-to-sync", perform aFlashCopy, and bring up the secondary site on the target disks

正确答案:D

第10题:

A customer with a small IT budget has one data center. Their main application is a database running on an IBM System Storage DS8000. The database has a data change rate of 50% per day. Once a week, they must do a point-in-time backup from the database to tape. The time it takes to run the backup now exceeds the backup window allowed. The customer requests a proposal to reduce database downtime caused by running backups, with nearly no impact to production volumes.    In addition to the tape backup, which DS8000 feature should a technical specialist propose()

  • A、FlashCopy
  • B、FlashCopy SE
  • C、Metro Mirror
  • D、Global Mirror

正确答案:A

更多相关问题