The approved Loading Program could substituted the approved Loading Manual and/or Trim and Stability Booklet
A Loading Program is required to have General Approval by classification Society prior to being considered for use on a specific ship
Following a satisfactory installation test on board the ship the Surveyor will issue a Program Installation Test
A Loading Program may be provided as a classification requirement or as an Owner’s option
第1题:
(c) Assess the likely criteria which would need to be satisfied for software to be regarded as ‘quality software’.
(4 marks)
第2题:
A software requirements specification is that () .
A.a rough list of things that the proposed software ought to do
B.a precise list of things that the proposed software ought to do
C.a formal list of things that the proposed software must do
D.an estimate of the resouroes (time, money, personnel, etc) which will be required to construct the proposed software
第3题:
In which phase of the software engineering process is the Software Requirements Specification developed?
A. definition phase
B.engineering
C.maintenance
D.development phase
第4题:
That THE CARGO SHALL BE LOADED AND DISCHARGED WITHIN THE NUMBER OF TOTAL RUNNING HOURS AS INDICATED,WEATHER PERMITTING,SUNDAYS AND HOLIDAYS EXCEPTED,UNLESS USED,IN WHICH EVENT TIME ACTUALLY USED SHALL COUNT is referred to as ______.
A.separate laytime for loading and discharging
B.total laytime for loading and discharging
C.commencement of laytime
D.laytime commencement of loading and discharging
第5题:
Software Engineering Economy is an effective part of software engineering.Which of the following content is the research content of software engineering economy?
Ⅰ.Estimation of software development cost
Ⅱ.Earn & Cost analysis of software development
Ⅲ.Adjustment of software development progress
A.Ⅲ only
B.Ⅱ and Ⅲ
C.Ⅰ and Ⅱ
D.all
第6题:
A. request sytem software add
B. request sytem software downgrade
C. request sytem software replace
D. request sytem software rollback
第7题:
A. Down, Init, 2 - Way, Exstart, Exchange, Loading, and Full
B. Down, Init, 2 - Wa y, Exchange, Exstart, Loading, and Full
C. Down, 2 - Way, Init, Loading, Exstart, Exchange, and Full
D. Down, 2 - Way, Init, Exchange, Exstart, Loading, and Full
E. Down, Init, 2 - Way, Loading, Exstart, Exchange, and Full
F. Down, 2 - Way, Init, Exstart, Exch ange, Loading, and Full
第8题:
About the following IP addresses , Which is incorrect ?
A.201.199.255.11
B.201.198.132.1
C.201.199.128.6
D.201.198.134.257
第9题:
The term under which the Shipowner is not responsible for loading and discharging,stowage and trimming costs is ________ .
A.FOBST
B.FIOST
C.FIOS
D.FIO
第10题: