The ()part of the ship on port is called the port bow.

题目
单选题
The ()part of the ship on port is called the port bow.
A

aft

B

forward

C

head

D

bow

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

The aft part of a vessel on the port side is called port().

  • A、port stern
  • B、quarter
  • C、aft quarter
  • D、starboard

正确答案:B

第2题:

When facing the bow on a ship, the left side is called the().

  • A、left side
  • B、starboard side
  • C、port side
  • D、port bow

正确答案:C

第3题:

材料:

When a ship shall have entered a port or place of refuge or shall have returned to her port or place of loading in consequence of accident,sacrifice or other extraordinary circumstances which render that necessary for the common safety,the expenses of entering such port or place shall be admitted as general average;and when she shall have sailed thence with her original cargo,or a part of it,the corresponding expenses of leaving such port or place of refuge consequent upon such entry or return shall likewise be admitted as general average.

When a ship is at any port or place of refuge and is necessarily removed to another port or place because repairs cannot be carried out in the first port or place,the provisions of this Rule shall be applied to the second port or place as if it were a port or place of refuge and the cost of such removal including temporary repairs and towage shall be admitted as general average.

The cost of handling on board or discharging cargo,fuel or stores whether at a port or place of loading,call or refuge,shall be admitted as general average,when the handling or discharge was necessary for the common safety or to enable damage to the ship caused by sacrifice or accident to be repaired,if the repairs were necessary for the safe prosecution of the voyage,except in cases where the damage to the ship is discovered at a port or place of loading or call without any accident or other extraordinary circumstances connected with such damage having taken place during the voyage.

问题:

The cost of handling on board cargo for the purpose of restowage for the common safety shall be admitted as ________.

A.particular average

B.common average

C.general average

D.private average

The repairs ________ shall not be admitted as general average.A.necessary for the common safety

B.necessary for the safe prosecution of the voyage

C.of the steering gear in consequence of accident endangering the ship and/or her cargo

D.of the damages discovered at a port or place of loading or call without any accident or other extraordinary circumstances

________ shall not be admitted as general average.A.the expenses of entering port or place of refuge

B.the corresponding expenses of leaving port or place of refuge

C.the cost of removal from port or place of refuge including temporary repairs and towage

D.the cost of handling on board or discharging cargo,fuel or stores solely for the purpose of restowage due to shifting during the voyage

This passage is likely extracted from ________.A.Marpol

B.ISM Code

C.SOLAS

D.York-Antwerp Rules

请帮忙给出每个问题的正确答案和分析,谢谢!


问题 1 答案解析:C


问题 2 答案解析:D


问题 3 答案解析:D


问题 4 答案解析:D

第4题:

单选题
Four years()my ship called at this port.
A

before

B

after

C

ago

D

since


正确答案: A
解析: 暂无解析

第5题:

Which two RSTP port roles include the port as part of the active topology?()

  • A、root
  • B、designated
  • C、alternate
  • D、backup
  • E、forwarding
  • F、learning

正确答案:A,B

第6题:

The forward part of the ship on port is called the().

  • A、port side
  • B、port quarter
  • C、port bow
  • D、fore port

正确答案:C

第7题:

船舶左舷的艉部叫左艉舷。()

  • A、The forward part of a vessel on the starboard side is called starboard quarter.
  • B、The aft part of a vessel on the starboard side is called port quarter.
  • C、The aft part of a vessel on the port side is called port quarter.
  • D、The forward part of a vessel on the port side is called port quarter.

正确答案:C

第8题:

If a ship will call at four ports for discharging, i.e.A.B.C and D consecutively, the cargo for ______ must generally be loaded first.

A.Port A

B.Port B

C.Port C

D.Port D


正确答案:D
如果船舶要到A、B、C、D四个港口卸货,则D港的货物先装。

第9题:

单选题
The port clearance for a ship should be granted()the completion of loading or discharging in the port.
A

before

B

when

C

after

D

during


正确答案: D
解析: 暂无解析

第10题:

单选题
The port in which crew or passengers go on board the ship is called().
A

port of call

B

port of embarkation

C

port of destination

D

port of disembarkation


正确答案: B
解析: 暂无解析

更多相关问题