( )is not the advantage of GERT(graphical evaluation and review techniques) as compared with PERT(project evaluation and review techniques)
A.allowing looping
B.allowing for dummy tasks
C.allowing branching
D.allowing multiple project end results
第3题:
The performance review interview is a vital component of any personnel evaluation system. Which of the following is not a characteristic of an effective personnel evaluation interview?
A . Performed by a supervisor who has adequately prepared for the interview
B . Discusses the employee's future performance goals
C . Discusses the employee's undesirable personality traits
D . Completed during a single, uninterrupted block of time
E . Focuses on a limited number of topics so that each topic can be discussed in detail
第4题:
第5题:
第6题:
Drug Evaluation
第7题:
_______
. A. conclusion B. description C. evaluation D. introduction
第8题:
176 The performance review interview is a vital component of any personnel evaluation system. Which of the following is not a characteristic of an effective personnel evaluation interview?
A. Performed by a supervisor who has adequately prepared for the interview
B. Discusses the employee's future performance goals
C. Discusses the employee's undesirable personality traits
D. Completed during a single, uninterrupted block of time
E. Focuses on a limited number of topics so that each topic can be discussed in detail
第9题:
第10题: