sprocket
Kenter link
swivel
end shackle
第1题:
Prior to magnetic particle inspection of anchor chain,the chain should be ______.
A.Degaussed
B.Demagnetized
C.Soaked
D.Sandblasted
第2题:
Lower the anchor until it is clear of ()(锚链筒).
第3题:
“The anchor was heaved aweigh” means ________
A.“The anchor was let go”
B.“The anchor was foul”
C.“The anchor was clear of the bottom”
D.“The anchor leading abeam”
第4题:
The chain is not upright
The chain is upright
The chain is slack
The chain is not slack
第5题:
In anchor orders, “Up and down” means “()”.
第6题:
In a combination chain and wire rope mooring system, the anchor chain is deployed at the anchor end of the line to ______.
A.increase fatigue life of the system
B.reduce the time to retrieve the line
C.increase the holding power
D.reduce the catenary
第7题:
“The anchor was heaved aweigh” means“()”.
第8题:
A design modification of an anchor chain which prevents kinking is the ______.
A.Detachable link
B.Stud link
C.Kenter link
D.Connecting link
第9题:
First,clean the ()(锚链舱)!
第10题:
warping head
fairlead
wildcat
capstan