Down by the bow
Down by the stern
Down by either the bow or stern
In level trim
第1题:
Cargo transfer operations on a tank vessel need NOT be stopped when ______.
A.a tug comes alongside while the tanker is loading grade D and E cargoes
B.a large,fresh oil spill is discovered immediately adjacent to the side of the tanker
C.there is an electrical storm in the vicinity
D.there is a fire on the dock or on a nearby vessel
第2题:
Which statement is TRUE concerning deep well self-priming pumps ________.
A.When loading oil cargo,it is always loaded via the discharge line through to the pump until the tank is topped off
B.Stripping systems are generally eliminated for the purposes of cargo handling
C.In recent years deep well pumps have become increasingly unpopular in product tankers and medium size crude ships
D.There is no danger of damaging the pump from overheating
第3题:
Pump out No. 2 port ballast tank to ______.
A.keep vessel afloating
B.refloat vessel listing to starboard
C.make vessel all-right
D.bring vessel upright
第4题:
Open the intake valve to an adjacent tank
Set out drip pans and sawdust and begin to mop up the spill
Signal the shore control point to shut down
Close the valve on the tank vent line
第5题:
close the static leg filling valve
close the overflow tank falling valve
reduce the fuel oil pumping rate
stop the fuel oil pumping operation
第6题:
The final inspection responsibility for seeing that a tank barge is provided with the required equipment and fittings in good and serviceable condition prior to loading cargo rests with the ______.
A.terminal operator
B.owner of the barge
C.tankerman or person in charge of loading
D.charterer through the Master of the towing vessel
第7题:
You are planning to use a crude oil washing system.What precaution must be taken with the tank as the source for the washing machines ________.
A.It must be debottomed and the level lowered by at least one meter
B.The oil in the source tank must be sampled for compatibility
C.The source tank must have been crude oil washed at least once in the past 150 days
D.The inert gas system must lower the oxygen content to a maximum of 12% oxygen in the tank
第8题:
In an auxiliary diesel engine bypass type lubricating oil system, the main lube oil pump forces_______ .
A.all of the oil used by the engine through a filter
B.some of the oil used by the engine through a filter
C.some of the oil used by the engine through a centrifuge
D.all of the oil used by the engine through a centrifuge
第9题:
Open the intake valve to an adjacent tank
Set out drip pans and sawdust and begin to mop up the spill
Signal the shore control point to shutdown
Close the valve on the tank vent line
第10题:
terminal operator
owner of the barge
tankerman or person in charge of loading
charterer through the Master of the towing vessel