All of the followings are orders between the bridge and the

题目
单选题
All of the followings are orders between the bridge and the engine room except ().
A

One-hour notice

B

Dead slow ahead

C

Finished with engines

D

Half astern

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

When comparing and contrasting the similarities and differences between bridges and switches, which of the following are valid statements? Choose all the valid answer choices)

A. Bridges are faster than switches because they have fewer ports.

B. A switch is a multiport bridge,

C. Bridges and switches learn MAC addresses by examining the source MAC address of each frame. received.

D. A bridge will forward a broadcast but a switch will not.

E. Bridges and switches increase the size of a collision domain.

F. None of the above statements are true.


正确答案:BC
B,C 解析:Explanation:
Both bridges and switches build the bridge table by listening to incoming frames and examining the source MAC address in the frame.

Switches are multiport bridges that allow you to create multiple broadcast domains. Each broadcast domain is like a distinct virtual bridge within a switch.

Incorrect Answers:
A. Switches are generally faster than bridges. Bridges also do not necessarily have fewer ports than switches.

D. Both bridges and switches will forward broadcast and multicast traffic, assuming that the traffic remains in the same VLAN.

E. The use of VLANs in a switch can decrease the size of the collision domain, by creating additional, smaller collision domains.

第2题:

The overall goal of the book is to help bridge the gap between research and teaching.()


正确答案:对

第3题:

The () between the rich and poor regions is being bridge.

A、space

B、distance

C、room

D、gap


参考答案:D

第4题:

Channel 13(156.65 MHz),the designated bridge-to-bridge channel,may NOT be used to ______.

A.exchange navigational information between vessels

B.exchange navigational information between a vessel and a shore station

C.conduct necessary tests

D.exchange operating schedules with company dispatcher


正确答案:D

第5题:

In an Information system. The( ) is the bridge between hardware and people

A.keyboard

B.internet

C.disk

D.data


正确答案:A

第6题:

Effective ()June 1, 2003, all full orders received for six week delivery will be billed.

A、as if

B、as for

C、as of

D、as to


参考答案:C

第7题:

The ORDERS table has these columns:ORDER_ID NUMBER(4) NOT NULLCUSTOMER_ID NUMBER(12) NOT NULLORDER_TOTAL NUMBER(10,2)The ORDERS table tracks the Order number, the order total, and the customer to whom the Order belongs.Which two statements retrieve orders with an inclusive total that ranges between 100.00 and 2000.00 dollars? ()

A. SELECT customer_id, order_id, order_total FROM orders RANGE ON order _ total (100 AND 2000) INCLUSIVE;

B. SELECT customer_id, order_id, order_total FROM orders HAVING order _ total BETWEEN 100 and 2000;

C. SELECT customer_id, order_id, order_total FROM orders WHERE order _ total BETWEEN 100 and 2000;

D. SELECT customer_id, order_id, order_total FROM orders WHERE order_total>= 100 and <= 2000;

E. SELECT customer_id, order_id, order_total FROM orders WHERE order_total>= 100 and order_total <= 2000;


参考答案:C, E

第8题:

He made efforts to bridge the _______ between people from different cultures.

A.gap

B.difference

C.diversity


参考答案:A

第9题:

The officer in charge of the engineering watch shall ensure that at all times bridge orders relating to changes in ______of operation are immediately implemented(执行).

A.ahead or astern

B.fore or aft

C.up or down

D.speed or direction


正确答案:D

第10题:

All of followings should be done by the project manager during project control except ().

A.Determine the a change has occurred
B.Ensure that a change is agreed
C.Make sure all changes are approveD.by management
D.Manage changes as they occur

答案:B
解析:
译文:项目经理不应该在项目控制过程中执行的工作是()。
A)确定变更已经发生
B)确保变更已达成共识
C)确保所有变更都获得管理层批准
D)在变更发生时,对变更进行管理

更多相关问题