dock riser
ship's cargo tanks
shore tank discharge
All of the above
第1题:
To agree with larger scale chart,latitudes taken from this chart should be increased ______ about 8 seconds.
A.with
B.in
C.by
D.to
第2题:
The tanks should then be ______ immediately after the measurements or cargo samples have been taken.
A.topped up
B.braced
C.tommed down
D.re-pressurized
第3题:
Have you ever served the auxiliary engine to combustion heavy oil? What should be borne in mind when transferring oil; from heavy oil to light oil?
第4题:
All scuppers plugged by carpenter
Tanks sounded from time to time
Watch kept for leakage
Take oil samples
第5题:
dock riser
ships cargo tanks
shore tank discharge
All of the above
第6题:
When discharging oil from an oil tanker the instantaneous rate ______ 60 liters per nautical mile.
A.Should not exceed
B.Must be up to
C.Should exceed
D.Should be about
第7题:
If there is another line already on the bollard ,the eye of the second line should be()before placing it over the bollard.
第8题:
When the steering gear is in operation, you should ______.
A.check hydraulic oil levels every hour
B.check the rams for overheating
C.check for excessive oil leakage from rams
D.drain water from tele-motor cylinders each watch
第9题:
Open the intake valve to an adjacent tank
Set out drip pans and sawdust and begin to mop up the spill
Signal the shore control point to shutdown
Close the valve on the tank vent line
第10题:
lube oil pump suction line
lube oil pump discharge line
bottom of the lube oil sump
outlet from the lube oil header