The well preparation of stowage plan will().

题目
单选题
The well preparation of stowage plan will().
A

increase the ship's officers' knowledge

B

extend the ship's officers' knowledge

C

improve the ship's cargo-handling equipment

D

raise the working efficiency

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

The actual amount of cargo loaded depends upon______.

A.the broken stowage listed

B.the broken stowage calculated

C.the broken stowage given

D.the actual broken stowage


正确答案:D
实际的装货重量依赖于实际的亏舱量。

第2题:

The tentative cargo plan ________ .

A.eliminates confusion with the final stowage plan

B.shows the approximate amount of cargo to be loaded in each hold

C.expedites the total operation

D.requires an unproportional number of gang hours of work to discharge the cargo


正确答案:B

第3题:

What cannot be learned from the passage?

A、computers will take the place of nurses in the future

B、it is not likely that computers can plan their own moves in chess games

C、it is not likely that computers can perform. tasks as well as people do

D、some programs have been written to give the computers i


参考答案:ABD

第4题:

A half-height container is used ______.

A.to carry cargos of low density

B.when stowage space is limited

C.to carry cargos such as steel products or drums

D.to double the stowage capacity of the vessel


正确答案:C
半高集装箱用来装载货物,例如钢铁制品、铁桶。

第5题:

The term Longitudinally Separated From by a Complete Hold in the preparation of stowage plan for dangerous cargoes means that ________ .

A.the cargoes shall be stowed in such positions that their vertical distances be greater than 3 meters

B.the cargoes shall be stowed in different holds or compartments

C.the cargoes shall be stowed in different holds or compartments between which there is at least a complete compartment

D.the cargoes shall be stowed in different holds or compartments between which there is at least a complete hold


正确答案:D

第6题:

– What do you think of this business plan? -- _______________.

A、Excuse me.

B、I think it’s perfect.

C、Very well.

D、That’s fine.


正确答案:B

第7题:

The term Away From in the preparation of stowage plan for dangerous cargoes means that ________ .

A.the cargoes shall be stowed in such positions that their vertical distances be greater than 3 meters

B.the cargoes shall be stowed in different holds or compartments

C.the cargoes shall be stowed in different holds or compartments between which there is at least a complete compartment

D.the cargoes shall be stowed in different holds or compartments between which there is at least a complete hold


正确答案:A

第8题:

direct preparation


正确答案:direct preparation method:稀配法将全部药物加入所需溶剂中一次配成所需浓度再行过滤。适用于优质原料。
directpreparationmethod:稀配法,将全部药物加入所需溶剂中,一次配成所需浓度,再行过滤。适用于优质原料。

第9题:

A cargo that has a stowage factor over 40 is know as a ______.

A.hygroscopic cargo

B.measurement cargo

C.stowage cargo

D.weight cargo


正确答案:B
基载因数超过40的货物被最为容积货。

第10题:

()is the process of identifying individual project risks as well as source of overall project risk,and documenting their characteristics.

A.identify risks
B.monitor risks
C.implement risks responses
D.plan risk management

答案:A
解析:
翻译:()是识别单个项目风险以及整个项目风险的来源,并记录其特征的过程。
A.识别风险
B.监控风险
C.实施风险应对措施
D.计划风险管理
识别风险是识别单个项目风险以及整个项目风险的来源,并记录其特征的过程。

更多相关问题