A customer is upgrading from a 16-core POWER6 570 with two e

题目
单选题
A customer is upgrading from a 16-core POWER6 570 with two enclosures to a 16-core Power 770 with only one enclosure. There are 22 PCI-X adapters and 19 PCIe adapters spread across the current CECs and I/O drawers. How many and what kind of drawers are needed to connect these adapters?()
A

2 PCI-X drawers and 2 PCIe drawers

B

3 PCI-X drawers and 4 PCIe drawers

C

4 PCI-X drawers and 3 PCIe drawers

D

4 PCI-X drawers and 2 PCIe drawers

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

You have a firewall filter containing two terms applied in an inbound direction on a customer interface.You would like this filter to protect your network from a spoofed denial of service attack. Which match criterion should be configured ito identify unwanted packets?()

  • A、from source-port
  • B、from source-address
  • C、from destination-address
  • D、from destination-port

正确答案:B

第2题:

What are two benefits for prospects, derived from the Cisco SBR Methodology?()

  • A、Creates a Link between Business and IT Planning
  • B、Increase Customer Royalty
  • C、Lowers TCO
  • D、Increase Profitability

正确答案:A,C

第3题:

You have a firewall filter containing two terms applied in an inbound direction on a customer interface.You would like this filter to protect your network from a spoofed denial of service attack. Which match criterion should be configured ito identify unwanted packets?()

A. from source-port

B. from source-address

C. from destination-address

D. from destination-port


参考答案:B

第4题:

A customer is interested in obtaining an AIX solution from IBM.  They have two primary global requirements:   ? Availability (although HACMP is not required)   ? Low cost   Which of the following approaches should the pSeries technical specialist use to meet the customer’s requirements and ensure customer satisfaction?()

  • A、Design the least-cost solution to prevent the competition from winning the business.
  • B、Design a disaster recovery (DR) solution and convince the customer why DR is important to their business.
  • C、Use the HACMP specialist to design the solution and include HA SmoothStart services as part of the proposal.
  • D、Design a solution with redundant parts and explain to the customer the incremental cost associated with the redundancy.

正确答案:D

第5题:

What are two benefits for the Cisco Partner, derived from the Cisco SBR Methodology?()

  • A、There is less risk through the implementation of proven solutions
  • B、Proactive planning enhances customer satisfaction
  • C、Thereare faster implementation of new business applications
  • D、Solution differentiation from the competition allows for premium margins

正确答案:B,D

第6题:

A customer needs a solution that provides a total of eight processors (four active and four inactive), 16GB of memory, Advanced POWER Virtualization, and the ability to grow.  Which of the followingsystems should the pSeries technical specialist propose?()

  • A、p650
  • B、p5-570
  • C、Two p630s
  • D、p5-570 Express

正确答案:B

第7题:

Which two features are added when upgrading from IPCC Express Standard to Enhanced? ()

  • A、Agent Routing  
  • B、Historical Reporting  
  • C、Conditional Routing  
  • D、Prioritized Queueing  
  • E、Agent Queueing

正确答案:A,D

第8题:

A storage specialist is discussing the customer’s high availability plan and discovers that they areonly 80 kilometers (50 miles) from the intended site. They require 7 x 24 x 365 data availability in aUNIX environment with an RPO of two minutes. They have two DS5300 systems located at bothsites. Which of the following IBM storage functions best meets the customer’s businesscontinuance requirements?()

  • A、HACMP
  • B、Volume copy
  • C、Metro Mirror
  • D、Global Mirror

正确答案:C

第9题:

A customer has an existing DS5300 system attached to two Brocade switches with eight Windowsservers. The customer wants to add their System i p750 server to this SAN. From the followingchoices what is the simplest and least expensive solution for this customer?()

  • A、add twofibre HBAs to the System i and connect to the SAN
  • B、add twofibre HBAs to the System i and connect to the Windows Servers
  • C、add twofibre HBAs to the System i and connect to the System i using VIOS
  • D、add two SAS HBAs to the Systemi array and connect directly to the DS5300

正确答案:A

第10题:

A customer has 5 older POWER5 systems and they want to consolidate them onto a POWER6 system. What information is important to analyze when deciding how to design the new machine using the System Planning Tool?()

  • A、 vmstat and iostat data from the older machines 
  • B、 The number of CPUs that were installed in the original machines 
  • C、 Data from Workload Estimator (WLE) and IBM Performance Management (PM) 
  • D、 Performance data that is collected from the new system after it has been put into production

正确答案:C

更多相关问题