Performance monitoring of a poorly performing system indicat

题目
单选题
Performance monitoring of a poorly performing system indicates a high level of CPU usage. Which tool can be used to help identify which processes are using excessive CPU resources?()
A

sar

B

topas

C

iostat

D

vmstat

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

● Perform Quality Control is the process of monitoring and recording results of executing the Quality Plan activities to assess performance and recommend necessary changes.(74) are the techniques and tools in performing quality control.

Statistical sampling ① Run chart ②

Control charts ③ Critical Path Method ④

Pareto chart ⑤ Cause and effect diagrams ⑥

(74)

A.①②③④

B.②③④⑤

C.①②③⑤⑥

D.①③④⑤⑥


正确答案:C
试题(74)分析
实现项目质量控制的方法、技术和工具包括统计抽样Statistical sampling,运行图Run chart、控制图Control charts、帕累托图Pareto chart,以及因果图Cause and effect diagrams等。
关键路径法Critical Path Method是制定项目进度计划的方法,因此选C
参考答案
(74)C

 

第2题:

Several reports are logged stating that an application server is performing slowly. During the investigation, the administrator notices that the hard drives on the server appear to have a high level of activity.Which items should the administrator monitor using performance monitoring tools?()

A. Page File

B. Disk Utilization

C. System Temperature

D. Processor Utilization

E. Network Utilization


参考答案:A, B

第3题:

Performing( )involves monitoring specific project results to determine ifthey comply with relevant quality standards and identifying ways to eliminate causes ofunsatisfactory results。 A.quality planning B.quality assurance C.quality performance D.quality control


正确答案:D
执行质量控制(quality control)指监控具体的项目结果,确定其是否符合相关的质量标准,并判断如何杜绝造成不合格结果的根源。

第4题:

After installing a new p5 595, the system performs poorly. Which of the following services would provide updates needed to fix the problem?()

  • A、Alert
  • B、Fix Central
  • C、Software Maintenance
  • D、Performance Monitoring

正确答案:A

第5题:

What allows you to monitor the system performance of the Cisco CRS System (CPU, memory, etc.)?()

  • A、Cisco Desktop Administrator  
  • B、Cisco Supervisor Desktop  
  • C、Microsoft Windows 2000 Performance Monitoring  
  • D、CRS Application Administration  
  • E、CRS Application Editor 

正确答案:C

第6题:

第一组

An automatic system usually consists of a control system and an information system. A control system is a system which measures the condition of some entity and, with the information, governs the state of a variable; i.e., speed, temperature, pressure, position, etc. The open-loop system is the simplest form. a control system may assume. It is distinguished from the closed-loop system by the lack of an input which measures the state of the controlled variable; such an input is called a feedback. In modern ships the open-loop system has practically disappeared and the closed-loop system which operates with a feed-back is extensively used. An information system serves the parallel function of monitoring system or plant performance. The monitoring function may serve a number of purposes; specifically it may indicate values of controlled variables to guide remote control operations, warn of off-limit conditions and provide record of performance. In many cases a visual and audible alarm may be provided to warn of off-limit conditions on board ship and, associated with this, the important variables will be recorded on demand. The automatic control system can be more sophisticated by incorporating digital-processing equipment, that is, a computer. This computer is usually fed with signals from all sensors. It scans the values of the sensors and generates alarm signals for off-limit conditions, acting as a super-supervisor. Sometimes, it can even make necessary and take the necessary action to optimize performance without human intervention.

The closed-loop system differs from the open-loop system by

A.the lack of a feedback

B.the presence of a feed back

C.the lack of a computer

D.the presence of a computer


正确答案:B

第7题:

Perform Quality Control is the process of monitoring and recording results*of executing the Quality Plan activities to assess performance and recommend necessary changes.() are the techniques and tools in performing quality control① Statistical sampling ② Run chart③ Control charts ④ Critical Path Method⑤ Pareto chart⑥ Cause and effect diagrams

A.①②③④
B.②③④⑤
C.①②③⑤⑥
D.①③④⑤⑥

答案:C
解析:
实现项目质量控制的方法、技术和工具包括统计抽样(Statistical sampling)、运行图 (Run chart)、控制图(Control charts)、帕累托图(Pareto chart),以及因果图(Cause and effect diagrams)等。关键路径法(Critical Path Method)是制定项目进度计划的方法,因此选C。

第8题:

Perform. Quality Control is the process of monitoring and recording resuks of executing the Quality Plan activities to assess performance and recommend necessary changes.( )are the techniques and tools in performing quality control. ①Activity network diagram②Cause and effect diagrams③Inspection④Flow chart⑤Work Breakdown Structure⑥Pareto chart A.①③⑤ B.②④⑤⑥ C.②③④⑤⑥ D.①②③④⑥


正确答案:D
执行质量控制是一个监督、评价项目质量计划活动执行结果和提出变更请求的过程。执行质量控制的技术和工具包括:活动网络图(Activity network diagram)、因果图(Cause and effect diagrams)、检查(Inspection)、流程图(Flow chart)和帕累托图(Pareto chart)等,但不包括工作分解结构(Work Breakdown Structure)。

第9题:

Several reports are logged stating that an application server is performing slowly. During the investigation, the administrator notices that the hard drives on the server appear to have a high level ofactivity.  Which items should the administrator monitor using performance monitoring tools? ()

  • A、 Page File
  • B、 Disk Utilization
  • C、 System Temperature
  • D、 Processor Utilization
  • E、 Network Utilization

正确答案:A,B

第10题:

Rate your level of proficiency with managing and maintaining a server environment, including monitoring system and server performance, managing Web servers, monitoring and analyzing events, managing software updates and site licenses, monitoring file and print servers, and managing servers remotely. ()

  • A、Very High
  • B、High
  • C、Moderate
  • D、Low
  • E、Very Low

正确答案:A

更多相关问题