What is the effect of using Capacity on Demand on LPARs conf

题目
单选题
What is the effect of using Capacity on Demand on LPARs configured on a managed system?()
A

It allows dynamic increase of CPU and memory allocation for all LPARs.

B

It allows dynamic increase of CPU and memory allocation for LPARs when the 'Desired' and 'Maximum' partition profile values are equal.

C

It allows dynamic increase of CPU and memory allocation for LPARs when the 'Desired' partition profile values are less than the 'Maximum' values.

D

It allows dynamic increase of CPU and memory allocation for LPARs when the 'Desired' partition profile values are greater than the 'Maximum' values.

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

When doing capacity planning for the Virtual I/O Server,what is the most important  consideration?()

  • A、The I/O workload needs of the client LPARs
  • B、The processing requirements of the client LPARs
  • C、The memory requirements of the client LPARs
  • D、The virtual Ethernet requirements between client LPARs

正确答案:A

第2题:

Using the command, user@router# load override latest.conf, where in the file system will the latest.conf be located?()

  • A、/var/home/user/
  • B、/var/config/saved/
  • C、/var/tmp/
  • D、/config/

正确答案:A

第3题:

A customer is currently using EMC disk. They are having an issue with the time it takes to complete a backup. What IBM tool can be used to show how much improvement can occur in the time it takes to backup the disk?()

A. TCOnow!

B. Disk Magic

C. Batch Magic

D. Capacity Magic


参考答案:B

第4题:

Which of the following functions can be performed using the Integrated Virtualization Manager?()

  • A、Concurrent firmware updates
  • B、Management of virtual storage
  • C、Hot add/remove of I/O drawers
  • D、Management of Capacity on Demand

正确答案:B

第5题:

In the context of configuring dial-on-demand routing using ISDN, what is the purpose of the dialer-list command?()

  • A、to identify valid numbers for incoming calls
  • B、to define the type of ISDN switch at the central office
  • C、to specify the list of outgoing phone numbers used by the router
  • D、to associate a dial configuration with a physical interface
  • E、to define interesting traffic that will enable the link

正确答案:E

第6题:

A customer would like to have the ability to permanently activate processor and memory resources as their workload increases. Which of the following supports the customer requirement?()

  • A、Reserve Capacity on Demand
  • B、Utility Capacity on Demand
  • C、Capacity Upgrade on Demand
  • D、Uncapped Capacity on Demand

正确答案:C

第7题:

On traffic lanes where demand is strong and plane capacity is limited, the air rates will be ()and vice versa for traffic lanes where supply exceeds demand.

  • A、low
  • B、high
  • C、normal
  • D、average

正确答案:B

第8题:

What is the effect of using the service password-encryption command?()

  • A、only passwords configured after the command has been entered will be encrypted
  • B、Only the enable password will be encrypted
  • C、Only the enable secret password will be encrypted
  • D、It will encrypt the secret password and remove the enable secret password from the configuration
  • E、It will encrypt all current and future passwords.

正确答案:E

第9题:

What is the effect of using Capacity on Demand on LPARs configured on a managed system?()

  • A、It allows dynamic increase of CPU and memory allocation for all LPARs.
  • B、It allows dynamic increase of CPU and memory allocation for LPARs when the 'Desired' and 'Maximum' partition profile values are equal.
  • C、It allows dynamic increase of CPU and memory allocation for LPARs when the 'Desired' partition profile values are less than the 'Maximum' values.
  • D、It allows dynamic increase of CPU and memory allocation for LPARs when the 'Desired' partition profile values are greater than the 'Maximum' values.

正确答案:C

第10题:

Company.com is running a p5-550 system with inactive processors. The system is managed using the Integrated Virtualization Manager. How would the system administrator activate two additional processors?()

  • A、Use the Advanced Systems Management Interface to enter the Capacity on Demand Enablement code.
  • B、Use the Web-based System Manager Interface to enter the Capacity on Demand enablement code.
  • C、Use smitty or smit interface to enter the Capacity on Demand enablement code.
  • D、Use oem_setup_env on the Virtual I/O Server to enter the Capacity on Demand enablement code.

正确答案:A

更多相关问题