A retail customer has an 8-core Power 740 server with 2 part

题目
单选题
A retail customer has an 8-core Power 740 server with 2 partitions. Production has 4 dedicated cores and the test partition has 2 dedicated cores. Both partitions run during the day without problems. At night, batch processing is exceeding the run window.  Which solution addresses this problem without requiring additional hardware?()
A

Adding VMControl will automate processor resource allocation during peak workloads 

B

Enable Dynamic Symmetric Multithreading in the HMC to balance workloads across processors.

C

Add processing resources during the times they are required using Utility Capacity on Demand.

D

Changing the partitions to Uncapped can make use of additional processor cycles during peak workloads. 

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

A retail customer has just install an IBM option into their server, but the option is not working properly. Which the following should be checked to determine if the devices is supported in the server?()

  • A、IBM ServerProven site
  • B、System x Reference Library (xRef)
  • C、COG Compatibility List
  • D、Hardware Compatibility List (HCL)

正确答案:A

第2题:

A customer is looking for a new file and print server and is considering a 2-socket Intel server with redundant power and hard disk that must fit in the current server rack. With 2U available in the rack, the customer is looking for the best price performance ratio.  Which IBM server will fit the best for this customer?()

  • A、x3200
  • B、x3455
  • C、x3550
  • D、x3650

正确答案:C

第3题:

A customer has a mixed environment of AIX on POWER4 and POWER5, and x86 based systems running a supported distribution of Linux. There is a total of 7 partitions and three standalone x86 servers. The customer wants to consolidate their applications using a single 4-core POWER6 server.  What is the minimum PowerVM edition that supports the customer requirement?()

  • A、 PowerVM Lx86
  • B、 PowerVM Express Edition
  • C、 PowerVM Standard Edition
  • D、 PowerVM Enterprise Edition

正确答案:C

第4题:

A customer requires two 12X loops on their new POWER7 system. What is the smallest system that will support two loops?()

  • A、Power 710
  • B、Power 720
  • C、Power 730
  • D、Power 740

正确答案:D

第5题:

Customer purchased and x3650 M3 server and requires the ability to remotely power on and off the server. What if any additional hardware would the customer need to purchase to remotely power the server on and off?()

  • A、Visual Media Key (VMK)
  • B、Integrated Management Module (IMM)
  • C、Remote Supervisor Adapter (RSA II)
  • D、Advanced Management Module (AMM)

正确答案:B

第6题:

A customer has an entry level Power System that is currently partitioned and managed by a Hardware Management Console (HMC). For operational reasons, it must be disconnected from the HMC and configured as a new development system.  How should the customer proceed to implement PowerVM Express and Integrated Virtualization Manager (IVM) on this Power System? ()

  • A、 Install a VIO server as an additional partition and DLPAR the resources from the existing partition to the VIO server.
  • B、 Create a service partition and install a VIO server. This will automatically move resources to the VIO server on reboot of the managed system.
  • C、 Delete all the existing LPARs, create a new LPAR and assign all the system resources to this LPAR and then install the VIO server on this LPAR.
  • D、 Reset the machine to Manufacturing Default Configuration and install the VIO server on the resulting partition created, which will own all system resources.

正确答案:D

第7题:

A retail customer has a database server that requires more than 64Gb memory and four or more processors sockets. Which of the following system x servers meets this requirements?()

  • A、x3655
  • B、x3950 M2
  • C、x3755
  • D、x3650 M3

正确答案:B

第8题:

Company.com has recently received a new p5-570 in the data center and intends to Micro-Partition the server. In which order should installation steps be taken?()

  • A、Connect to the network,power on the server,Micro-Partition the server
  • B、Connect to the HMC,power on the server,Micro-Partition the server,connect to the network
  • C、Power on server,connect to the network,Micro-Partition the server,connect to the HMC
  • D、Power on the server,connect to the HMC,Micro-Partition the server,connect to the network

正确答案:B

第9题:

A customer has a key application running in a logical partition on a POWER5 system. The customer wants the ability to run the application with minimal down time using Live Partition Mobility.  Which of the following is the minimum PowerVM edition and hardware configuration that will support the customer requirement?()

  • A、 PowerVM Standard Edition on POWER6 hardware
  • B、 PowerVM Standard Edition with POWER5 hardware 
  • C、 PowerVM Enterprise Edition with POWER6 hardware
  • D、 PowerVM Enterprise Edition with POWER5 hardware

正确答案:C

第10题:

A customer has been quoted a DS8800. Which part of the TDA process would ensure that there isenough power in the customer location to operate the system?()

  • A、 Pre-sale 
  • B、 Post-sale 
  • C、 Pre-install 
  • D、 Post-install

正确答案:C

更多相关问题