Which three components does the Scheduler use for managing tasks within the Oracle environment? ()(Choose three.)
第1题:
A. Testing the backup and recovery procedures
B. Testing the upgrade of an Oracle database to a new release
C. Testing the effect of an application changes on database performance
D. Continuously updating archive log files from the target database to support failover
第2题:
A. hold priority
B. setup priority
C. FEC IP address
D. resource availability
E. local protection option
第3题:
A. a job
B. a program
C. a schedule
D. a PL/SQL procedure
第4题:
On which three traffic types does firewall pass-through authentication work? ()(Choose three.)
第5题:
Which three of the following are components of a syslog message? ()(Choose three.)
第6题:
A. ping
B. FTP
C. Telnet
D. HTTP
E. HTTPS
第7题:
A. 3577 UDP
B. 3578 UDP
C. 3678 UDP
D. 3577 TCP
E. 3578 TCP
第8题:
A. a job
B. a program
C. a schedule
D. a PL/SQL procedure
第9题:
Which three statistics does the Executive report summarize?() (Choose three.)
第10题:
Which three ports does a WX device use for control traffic purposes?() (Choose three.)