A new storage array must be configured for a database server. This array will store transaction logs that are always being written. Which of the following RAID solutions would provide fault tolerance and fast write operations without the use of parity? ()
第1题:
A customer wants to add a new application to their existing IBM System Storage DS5300. Theyexpect that the new application will require a minimum of 15,000 additional IOPS. What toolshould be used to determine what additional disk is required to effectively add the newapplication?()
第2题:
A customer server has the maximum local storage installed. The customer plans to share this new storage with other servers. Which of the following provides that server additional storage?()
第3题:
A. disaster recovery strategy
B. the number of IOPS required
C. the capacity of each hard drive
D. how the database will be backed up
第4题:
A customer recently installed new SAN with an IBM System Storage DS8300 and several open systems servers to address a need for storage consolidation and still provide good response time. They have asked the Business Partner technical representative for the most complete IBM product that would allow them to do performance reporting of the new SAN environment. What is the best solution()
第5题:
A storage specialist needs to create a new host connection using the DSCLI. Which of the following parameters identifies the host()
第6题:
A customer recently installed new a SAN with an IBM System Storage DS8700 and several open systems servers to address a need for storage consolidation and still provide good response time. They have asked the Business Partner technical representative for the most complete IBM product that would allow them to do performance reporting of the new SAN environment. What is the best solution()
第7题:
A customer is implementing a new streaming audio application and has requested a storageresource management product that will provide performance metrics for their IBM System StorageDS5100. The requirements are for controller read rates as well as controller data rate, amongothers. What IBM storage resource management tool would a technical specialist recommend?()
第8题:
A new array of hard drives has been added to an existing server; however, when the server is booted into the Windows OS the new drives fail to appear in My Computer. From which of the following locations can the new storage drives be added?()
第9题:
The Business Partner technical specialist is planning the space requirements for a new IBM DS8000. The service clearance requirements refer to the area required to ()
第10题:
A customer has two data centers, 500 kilometers apart. The customer requests a proposal for new storage subsystems and a disaster recovery solution that provides consistent data in the event of a disaster at the local site. Which IBM System Storage DS8000 solution should the storage specialist propose to the client()