A customer plans to implement SVC as part of a solution and has concerns regarding the resilience of the SVC architecture. The correct response to this concern is that SVC().
第1题:
A customer plans to replace a McData 6140 core director with a Cisco MDS 9506. The storage is based on SVC with three DS5300 back-end storage systems. The storage resources are attached to the 6140 core while all servers are attached to edge switches. Linux, Windows and AIX servers use the SVC.Which of the following is a potential risk associated with this planned migration?()
A. thereare no potential risks
B. the FCIDs of the servers must be changed
C. the SVC must be shut down during the migration
D. changing the FCIDs of storage resources will impact some servers
第2题:
A bank has requested proposals for a storage solution to implement disaster recovery processes for their IBM System z configured with Linux, IBM System p configured with AIX, and Microsoft Windows environments. The solution must simulate a multi-site environment and provide the customer the ability to evaluate Metro Mirror, Global Mirror, and FlashCopy. Floor space is limited.What hardware platform provides this native support?()
A. IBM XIV Storage System
B. IBM System Storage DS5300
C. IBM System Storage DS8800
D. IBM System Storage DS5020 with SVC
第3题:
A./lib/svc/method/net-physical
B./etc/rcS.d/S30network
C.svc:/network/rpc/bind:default
D./lib/svc/method/rpc-bind
第4题:
When planning an SVC environment with the customer, the storage specialist finds that they wishto include iSCSI storage into the cluster. In this situation what is needed to place the storage intoproduction?()
第5题:
说明PVC和SVC的区别,以及建立SVC的过程。
第6题:
A. is stateless with global referencing of metadata
B. is based on cluster architecture with externally provided quorum disks
C. is based on cluster architecture, with quorum held internally on the first cluster node
D. is based on grid architecture, with each node holding a full mirror configuration for all other nodes
第7题:
A.0
B.1
C.2
D.4
第8题:
A. the customer
B. IBM customer engineer
C. certified IBM Business Partner
D. IBM Maintenance and Technology Support organization
第9题:
A bank has requested proposals for a storage solution to upgrade their disaster recoveryprocesses for their System z, UNIX, and Microsoft Windows environment. The solution mustsimulate a multi-site environment and provide the customer the ability to explore Metro Mirror,Global Mirror, Global Mirror for z/OS, and FlashCopy. Floor space is limited. Which solution bestmeets the specified requirements?()
第10题:
A customer has two separate storage networks and is planning to implement an SVC to provide for FlashCopy between the two networks. What is the minimum number of ISL ports required?()