单选题A technician has found that the uninterruptible power supply (UPS) connected to a server does not have sufficient battery power to allow the server to shutdown gracefully. Which of the following is the MOST cost effective way to allow this server to sh

题目
单选题
A technician has found that the uninterruptible power supply (UPS) connected to a server does not have sufficient battery power to allow the server to shutdown gracefully. Which of the following is the MOST cost effective way to allow this server to shutdown gracefully?()
A

Install a second UPS.

B

Increase the size of the swapfile.

C

Increase the size of the pagefile.

D

Install an extended battery pack into the UPS

参考答案和解析
正确答案: D
解析: 暂无解析
如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

An administrator has a malfunctioning uninterruptible power supply (UPS). Which of the following is the MOST likely cause of the problem?()

A. Battery needs to be replaced

B. Light switch is turned off

C. Smart cable is disconnected

D. UPS needs a firmware update


参考答案:A

第2题:

Which of the following is the MOST likely to cause a server power supply fan to fail but allows the power supply to still be functional?()

  • A、Dust
  • B、Power Surge
  • C、Excessive humidity
  • D、High temperatures

正确答案:A

第3题:

Which of the following is the MOST important physical consideration when deploying a new server?()

A. Humidity monitors, Biometrics, and fire suppression

B. Cooling, rack space, and power requirements

C. Service level agreements, uninterruptible power supply (UPS) deployment, and CCTV

D. Biometrics, fire suppression, and power requirements


参考答案:B

第4题:

A technician has found that the uninterruptible power supply (UPS) connected to a server does not have sufficient battery power to allow the server to shutdown gracefully. Which of the following is the MOST cost effective way to allow this server to shutdown gracefully?()

  • A、Install a second UPS.
  • B、Increase the size of the swapfile.
  • C、Increase the size of the pagefile.
  • D、Install an extended battery pack into the UPS

正确答案:D

第5题:

Which of the following should be kept in uninterruptible power supply (UPS) documentation records?()

  • A、 Antivirus software version
  • B、 Battery replacement date
  • C、 Wire shelving diagram
  • D、 IP address for network printer
  • E、 Shutdown delay timing

正确答案:B,E

第6题:

A technician turns on a PC and before the computer boots up, the technician is prompted for apassword. The technician does not know the password. Which of the following can the techniciando to allow access to the PC?() (Select TWO).

  • A、Set the clear password jumper on the motherboard
  • B、Enter the BIOS setup and select the clear password setting
  • C、Remove the power cord from the power supply and then plug it back in
  • D、Power cycle the PC
  • E、Remove the CMOS battery for 15 minutes

正确答案:A,E

第7题:

An administrator is working on a rack mount server with all newly installed equipment. Theuninterruptible power supply (UPS) in the rack starts beeping loudly. Which of the following is the FIRST troubleshooting step that should be taken?()

  • A、Ensure that the power cable for the UPS is plugged in.
  • B、Ensure the battery in the UPS is still good.
  • C、Check the smart cable connecting the UPS to the server.
  • D、Reset the UPS to determine if the problem persists.

正确答案:A

第8题:

An administrator will replace five current servers. Which of the following is the MOST important to review before installing new servers?()

A. Verify uninterruptible power supply (UPS) load

B. Verify if server consumes 220V

C. Verify CPU load

D. Verify if server consumes 110V


参考答案:C

第9题:

A Windows server has rebooted by itself several times.There are several functioning non-Windows servers in the same rack that are connected to the same uninterruptible power supply(UPS).Which of the following is the MOST likely cause of the reboots?()

  • A、The UPS is malfunctioning.
  • B、The user traffic to the server is too high.
  • C、A BSOD is occurring.
  • D、The non-Windows servers cannot be located on the same UPS as the Windows server.

正确答案:C

第10题:

An administrator will replace five current servers. Which of the following is the MOST important to review before installing new servers?()

  • A、 Verify uninterruptible power supply (UPS) load
  • B、 Verify if server consumes 220V
  • C、 Verify CPU load
  • D、 Verify if server consumes 110V

正确答案:A