单选题You set the recovery window to seven days and the backup optimization to ON using the CONFIGURE command of Recovery Manager (RMAN). The most recent backup of the TOOLStablespace to disk was taken on January 3. The TOOLStablespace is read-only.On Februa

题目
单选题
You set the recovery window to seven days and the backup optimization to ON using the CONFIGURE command of Recovery Manager (RMAN). The most recent backup of the TOOLStablespace to disk was taken on January 3. The TOOLStablespace is read-only.On February 21, when you execute a command to back up all the tablespaces to disk, you find that RMAN backs up the TOOLS tablespace also, even though the contents of the tablespace have not changed after the backup on January 3. Because there are no changes made to the TOOLStablespace, you decide that the tablespace should not be backed up by RMAN. What can you do to skip backing up the TOOLStablespace without changing the current backup optimization setting?()
A

 configure a default device for RMAN backups

B

 temporarily disable the retention policy for RMAN backups

C

 configure automatic channel allocation for RMAN backups

D

 use the CONFIGURE command to reconfigure the recovery window to 60 days

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

You want the ability to recovery any time within the last seven days and therefore you configured the recovery window retention policy using the command:   RMAN> CONFIGURE RETENTIOH POLICY TO RKCOVFRY WINDOW OF 7 DAYS;   After configuring the recovery window, you performed the database backup as follows:()  

  • A、 Backup RB1 at log sequence number 12871 on 5th Jan
  • B、 Backup RB2 at log sequence number 15622 on 12th Jan
  • C、 Backup RB3 at log sequence 16721 on 15th Jan
  • D、 On 20th Jan when the log sequence number was 18112 you realize that there Is a need to a point in time at the beginning of the recovery window. You have all an hived redo log files to date.

正确答案:D

第2题:

You set the recovery window to seven days and the backup optimization to ON using the CONFIGURE command of Recovery Manager (RMAN). The most recent backup of the TOOLS tablespace to disk was taken on January 3. The TOOLS tablespace is read/x7fonly.  On February 21, when you execute a command to back up all the tablespaces to disk, you find that RMAN backs up the TOOLS tablespace also, even though the contents of the tablespace have not changed after the backup on January 3.  Because there are no changes made to the TOOLS tablespace, you decide that the tablespace should not be backed up by RMAN. What can you to do skip backing up the TOOLS tablespace without changing the current backup optimization setting?()

  • A、configure a default device for RMAN backups
  • B、temporarily disable the retention policy for RMAN backups
  • C、configure automatic channel allocation for RMAN backups
  • D、use the CONFIGURE command to reconfigure the recovery window to 60 days

正确答案:B

第3题:

Consider the following scenario for your database:- Backup optimization is enabled in RMAN.- The recovery window is set to 7 days in RMAN.- The most recent backup to disk for the TOOLS tablespace was taken on November 3, 2007.- The TOOLS tablespace is read-only since November 4, 2007.On November 23, 2007, you issue the RMAN command to back up the database to disk.Which statement is true regarding the backup of the TOOLS tablespace?()

A. The RMAN backup fails because the TOOLS tablespace is read-only

B. The RMAN skips the backup of the tablespace because backup optimization is enabled

C. The RMAN makes backup because optimization can be enabled only for backups to disk

D. The RMAN makes the backup because no backup of the tablespace exists within the seven day window


参考答案:D

第4题:

You configured the default backup device type as disk for RMAN backups. In your database,because of business requirements,you have to take a simultaneous duplicate backup of the data files when the RMAN BACKUP command is used.  What must you set using the RMAN CONFIGURE command to achieve this?()  

  • A、 MAXSETSIZE TO 2
  • B、 DEVICE TYPE DISK PARALLELISM 2
  • C、 RETENTION POLICY TO REDUNDANCY 2
  • D、 DATAFILE BACKUP COPIES FOR DEVICE TYPE DISK TO 2

正确答案:C

第5题:

Consider the following scenario for your database: - Backup optimization is enabled in RMAN. - The recovery window is set to 7 days in RMAN. - The most recent backup to disk for the TOOLS tablespace was taken on November 3, 2007. - The TOOLS tablespace is read-only since November 4, 2007. On November 23, 2007, you issue the RMAN command to back up the database to disk. Which statement is true regarding the backup of the TOOLS tablespace?()

  • A、The RMAN backup fails because the TOOLS tablespace is read-only
  • B、The RMAN skips the backup of the tablespace because backup optimization is enabled
  • C、The RMAN makes backup because optimization can be enabled only for backups to disk
  • D、The RMAN makes the backup because no backup of the tablespace exists within the seven day window

正确答案:D

第6题:

In Recovery Manager (RMAN), you have set control file autobackup to ON by using the following command:  CONFIGURE CONTROLFILE AUTOBACKUP ON;  Which two events would cause the control file to be backed up automatically? ()

  • A、a tablespace is taken offline
  • B、the database instance is restarted
  • C、a new data file is added to an existing tablespace
  • D、a successful backup is recorded in the RMAN repository
  • E、the RMAN connection is disconnected from the target database

正确答案:C,D

第7题:

In which scenario, will you issue the following command?() RMAN> REPORT NEED BACKUP DAYS 7;

  • A、 to configure RMAN to maintain backup information in the RMAN repository for seven days
  • B、 to configure RMAN to maintain backup information in the control file for at least seven days
  • C、 to display the list of files that have not been backed up for the last seven days
  • D、 to display the list of files that must be backed up within seven days

正确答案:C

第8题:

In Recovery Manager (RMAN), you set the retention policy to NONE by executing the following command:  CONFIGURE RETENTION POLICY TO NONE;  What would be the impact of this setting?()

  • A、The retention policy is cleared.
  • B、RMAN does not consider any backup as obsolete.
  • C、The retention policy is set to its default setting of redundancy 1.
  • D、The retention policy is set to its default setting of recovery window 7.

正确答案:B

第9题:

You defined the Recovery Manager (RMAN) retention policy to recovery window of 7 days by executing the following command:  RMAN> CONFIGURE RETENTION POLICY TO RECOVERY WINDOW OF 7 DAYS;  When a backup is performed, what would be the status of this backup after seven days?()

  • A、 The backup would be marked as invalid.
  • B、 The backup would be marked as obsolete.
  • C、 The backup would be removed from the media.
  • D、 The backup would be removed from the RMAN repository.

正确答案:B

第10题:

In Recovery Manager (RMAN), you have set control file autobackup to ON by using the following command: CONFIGURE CONTROLFILE AUTOBACKUP ON; Which two events would cause the control file to be backed up automatically? ()

  • A、 A tablespace is taken offline.
  • B、 The database instance is restarted.
  • C、 A new data file is added to an existing tablespace.
  • D、 A successful backup is recorded in the RMAN repository.
  • E、 The RMAN connection is disconnected from the target database.

正确答案:C,D