Megatronix has conducted a new customer ______ survey.

题目
单选题
Megatronix has conducted a new customer ______ survey.
A

satisfied

B

satisfaction

C

satisfying

D

satisfactory

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

A customer has two single cluster IBM TS7700 Virtualization Engines at the same site. The customer wants to move one to a remote site and set up a grid configuration with the two clusters. The customer has fibre between the two sites. What is the most important factor to consider when planning the new configuration?()

A. operator training

B. cache size of the two clusters

C. fibre bandwidth capability between the sites

D. number of stacked tape drives attached to each cluster


参考答案:C

第2题:

A customer is deploying a new Junos Pulse Access Control Service and has completed the initial boot configuration as prompted using a serial connection. The customer now wants to complete the rest of the configuration using the admin GUI.Into which port on the Junos Pulse Access Control Service should the customer plug the network cable to enable access to the admin GUI?()

  • A、the internal interface
  • B、the external interface
  • C、the management interface
  • D、the console interface

正确答案:A

第3题:

A technician has just finished installing a new NIC into a customer’s desktop. Which of thefollowing should the technician do NEXT?()

A. Perform a full system backup.

B. Follow up with the customer, verifying satisfaction.

C. Ask their manager to contact the customer.

D. Perform a complimentary virus scan.


参考答案:B

第4题:

A customer server has the maximum local storage installed. The customer plans to share this new storage with other servers. Which of the following provides that server additional storage?()

  • A、Add External Storage via EXP3000
  • B、Replace current storage with more dense drives
  • C、Add External Storage via SAN
  • D、Add storage expansion blade

正确答案:C

第5题:

A customer has installed a new computer on their network. They can print to the printer but the option for duplex printing is not available. All other computers have the option. Which of the following is the cause of the problem?()

  • A、The new computer is printing to the wrong IP address.
  • B、The new computer is using the wrong protocol.
  • C、The driver port is not setup correctly.
  • D、The option has not been selected on the driver.

正确答案:D

第6题:

The customer is considering an IBM System Storage DS8000. Which of the following indicates a requirement for the Business Partner to perform a TDA?()

  • A、capacity above 500 TB
  • B、first in customer location
  • C、a new model has been released
  • D、sold without implementation service

正确答案:B

第7题:

A customer has two single cluster IBM TS7700 Virtualization Engines at the same site. The customer wants to move one to a remote site and set up a grid configuration with the two clusters. The customer has fibre between the two sites. What is the most important factor to consider when planning the new configuration?()

  • A、operator training
  • B、cache size of the two clusters
  • C、fibre bandwidth capability between the sites
  • D、number of stacked tape drives attached to each cluster

正确答案:C

第8题:

The customer is considering an IBM System Storage DS8000. Which of the following indicates a requirement for the Business Partner to perform a TDA?()

A. capacity above 500 TB

B. first in customer location

C. a new model has been released

D. sold without implementation service


参考答案:B

第9题:

A prospective customer has a SCSI installed. The new project requires a large high performance storage and tape network . The customer does not appear to understand the terminology and options of the fiber channel components of the solution. Further discussion confirms that the customers only has cursory knowledge of fiber channel and is not currently prepared to for the installation. What steps should be taken to make sure customer is satisfied with the solution? ()

  • A、Suggest a cloud network
  • B、Direct the customer to redbooks and white papers on FC technologies
  • C、Work with business partner to include Lab Service engagement to setup FC environment and perform knowledge transfer
  • D、Switch project to iSCSI

正确答案:C

第10题:

An IBM Business Partner has sold a DS5020 and new IBM SAN switches to replace a customer EMC storage infrastructure. The customer dissatisfaction has arisen during the installation because according to the DS5020 interoperability matrix, two HP Proliant servers running Exchange have FC HBAs that are not supported. Which of the following is the most probable cause of the customer dissatisfaction()

  • A、The EMC storage specialist has not participated in the TDA meeting
  • B、The FC HBAs are 4 Gbps technology
  • C、The Technical and Delivery Assessment review actions were not executed
  • D、The customer should have checked that the HBAs are supported according to the HP storage interoperability matrix

正确答案:C

更多相关问题