satisfied
satisfaction
satisfying
satisfactory
第1题:
A customer has two single cluster IBM TS7700 Virtualization Engines at the same site. The customer wants to move one to a remote site and set up a grid configuration with the two clusters. The customer has fibre between the two sites. What is the most important factor to consider when planning the new configuration?()
A. operator training
B. cache size of the two clusters
C. fibre bandwidth capability between the sites
D. number of stacked tape drives attached to each cluster
第2题:
A customer is deploying a new Junos Pulse Access Control Service and has completed the initial boot configuration as prompted using a serial connection. The customer now wants to complete the rest of the configuration using the admin GUI.Into which port on the Junos Pulse Access Control Service should the customer plug the network cable to enable access to the admin GUI?()
第3题:
A. Perform a full system backup.
B. Follow up with the customer, verifying satisfaction.
C. Ask their manager to contact the customer.
D. Perform a complimentary virus scan.
第4题:
A customer server has the maximum local storage installed. The customer plans to share this new storage with other servers. Which of the following provides that server additional storage?()
第5题:
A customer has installed a new computer on their network. They can print to the printer but the option for duplex printing is not available. All other computers have the option. Which of the following is the cause of the problem?()
第6题:
The customer is considering an IBM System Storage DS8000. Which of the following indicates a requirement for the Business Partner to perform a TDA?()
第7题:
A customer has two single cluster IBM TS7700 Virtualization Engines at the same site. The customer wants to move one to a remote site and set up a grid configuration with the two clusters. The customer has fibre between the two sites. What is the most important factor to consider when planning the new configuration?()
第8题:
A. capacity above 500 TB
B. first in customer location
C. a new model has been released
D. sold without implementation service
第9题:
A prospective customer has a SCSI installed. The new project requires a large high performance storage and tape network . The customer does not appear to understand the terminology and options of the fiber channel components of the solution. Further discussion confirms that the customers only has cursory knowledge of fiber channel and is not currently prepared to for the installation. What steps should be taken to make sure customer is satisfied with the solution? ()
第10题:
An IBM Business Partner has sold a DS5020 and new IBM SAN switches to replace a customer EMC storage infrastructure. The customer dissatisfaction has arisen during the installation because according to the DS5020 interoperability matrix, two HP Proliant servers running Exchange have FC HBAs that are not supported. Which of the following is the most probable cause of the customer dissatisfaction()