A customer has a requirement for Disaster Recovery for compl

题目
单选题
A customer has a requirement for Disaster Recovery for compliance within their industry. Theyhave an RPO of 4 hours and an RTO of 24 hours. Cost is a consideration. What is the most costeffective DR implementation?()
A

a disk-to-disk backup solution keeping all storage in the data center

B

a backup solution that includes magnetic tape that is shipped to an off-site storage facility

C

a less powerful copy environment at a hot site with asynchronous mirroring and cluster technology

D

an exact copy of the primary environment at a hot site with remote mirroring and cluster technology

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

The customer is considering an IBM System Storage DS8000. Which of the following indicates a requirement for the Business Partner to perform a TDA?()

  • A、capacity above 500 TB
  • B、first in customer location
  • C、a new model has been released
  • D、sold without implementation service

正确答案:B

第2题:

A customer needs to achieve a very aggressive RTO of 30 minutes or less. A critical requirement is a continuous availability and disaster recovery solution for the mainframe environment. What IBM solution should be recommended to this customer?()

  • A、Metro Mirror
  • B、Metro/Global Mirror
  • C、Geographically Dispersed Open Servers (GDOS)
  • D、Geographically Dispersed ParallelSysplex (GDPS)

正确答案:D

第3题:

A customer needs to achieve a very aggressive RTO of 30 minutes or less. A critical requirement is a continuous availability and disaster recovery solution for the mainframe environment.What IBM solution should be recommended to this customer?()

A. Metro Mirror

B. Metro/Global Mirror

C. Geographically Dispersed Open Servers (GDOS)

D. Geographically Dispersed ParallelSysplex (GDPS)


参考答案:D

第4题:

The customer is planning a new IBM System Storage DS5020 using iSCSI and direct attachedfibre channel connectivity in a redundant configuration. The customer is planning to set up adisaster recovery solution in the near future by using Enhanced Remote Mirroring. Which of thefollowing considerations are critical for this customer?()

  • A、customer must reconfigure aniSCSI port for mirroring
  • B、customer must set up a fabric and dedicate port 4 for disaster recovery
  • C、customer must set up a fabric and dedicate port 2 for disaster recovery
  • D、replication is not possible with the DS5020, they must consider the DS5300

正确答案:C

第5题:

A customer has two sites located 500 kilometers apart. The customer has both a high-speedInternet link and dark fiber between the sites. The customer wants to utilize storage resources ateither site leveraging replication for disaster recovery implementations. The customer wants to linkthese two sites together. Which option provides the highest performance and is most reliable?()

  • A、iFCP router
  • B、FCIP router
  • C、DWDM and CWDM
  • D、LC multi-mode 50 micron fiber

正确答案:C

第6题:

Which of the following is the MOST important step in preparing for disaster recovery?()

  • A、 Test the disaster recovery plan process
  • B、 Identify key disaster recovery personnel
  • C、 Ensure that all backup data is kept off-site
  • D、 Assist management with IT backup policy decisions

正确答案:A

第7题:

A customer has a combination of fifteen Windows file servers with direct attached storage and three Power Systems with AIX database servers SAN attached to a DS4700.  They would like to upgrade and plan for 40 TB capacity.  The customer needs to move to a more scalable storage system to include all servers.Which of the following would be most appropriate to ask first?()

  • A、What are the plans for Disaster Recovery? 
  • B、What are the plans for data migration? 
  • C、Would iSCSI meet your needs? 
  • D、How much space is available in the current storage systems?

正确答案:B

第8题:

A customer has an IBM System Storage DS8100 at their primary site and a DS6800 at their recovery site, 9.5 kilometers away. They want to replicate data for disaster recovery backup with the least impact on performance.Which of the following products best accomplishes this task?()

A. Global Copy

B. Metro Mirror

C. Global Mirror

D. Metro/Global Mirror


参考答案:C

第9题:

A customer has a requirement for Disaster Recovery for compliance within their industry. Theyhave an RPO of 4 hours and an RTO of 24 hours. Cost is a consideration. What is the most costeffective DR implementation?()

  • A、a disk-to-disk backup solution keeping all storage in the data center
  • B、a backup solution that includes magnetic tape that is shipped to an off-site storage facility
  • C、a less powerful copy environment at a hot site with asynchronous mirroring and cluster technology
  • D、an exact copy of the primary environment at a hot site with remote mirroring and cluster technology

正确答案:B

第10题:

A customer has just obtained a second data center through the acquisition of a competitor.   The IT Director is now seeking to merge,integrate,and rebalance systems across the two data centers over thenext two years.   They have just deployed a high-speed point-to-point circuit between the facilities. The IT Director would like a system that could backup their AIX and Win2K servers and electronically vault the data between sites as part of their Disaster Recovery Plan.   What product should the pSeries technical specialist recommend for this requirement?()

  • A、CSM
  • B、TSM
  • C、NIM
  • D、Sysback

正确答案:B