Sell Sysback
Conduct a SAR
Sell Supportline
Provide a project timeline
第1题:
A section of the building has been having intermittent connectivity problems lately. An action plan and solution has been created. Which of the following steps would an administrator perform NEXT?()
第2题:
A customer has requested the most cost-effective p5 solution allowing for growth. Which of the following should the pSeries technical specialist consider doing when configuring each p5 system using eConfig?()
第3题:
A customer is looking for a solution to provide high performance storage. A competing vendor has proposed a solution based on a loosely coupled model of 1Gbps iSCSI and SATA disks.What alternative solution could be proposed that is cost-effective and high-performance?()
A. DS8000
B. HDS VSP
C. EMC V-Max standard configuration
D. XIV system 15 module configuration
第4题:
A customer has two data centers, 500 kilometers apart. The customer requests a proposal for new storage subsystems and a disaster recovery solution that provides consistent data in the event of a disaster at the local site. Which IBM System Storage DS8000 solution should the storage specialist propose to the client()
第5题:
A solution provider has proposed a pSeries solution to a new customer. The solution is complex with a number of technologies that are new to the customer. They have a tight timeline for implementation. The solution provider has not been able to get a clear understanding as to how the customer will backup the system. What would be the most appropriate action to address the risks with this solution?()
第6题:
A customer is interested in obtaining an AIX solution from IBM. They have two primary global requirements: ? Availability (although HACMP is not required) ? Low cost Which of the following approaches should the pSeries technical specialist use to meet the customer’s requirements and ensure customer satisfaction?()
第7题:
A customer is looking for a solution to provide high performance storage. A competing vendor has proposed a solution based on a loosely coupled model of 1Gbps iSCSI and SATA disks. What alternative solution could be proposed that is cost-effective and high-performance?()
第8题:
Lafeyette Productions is looking for a new ISP that has improved availability, load balancing, and catastrophe protection. Which type of ISP connectivity solution would be best?()
第9题:
A client’s CIO validates that IBM proposed virtualization/consolidation solution addresses their key pain points. However, the CFO is more concerned with risk mitigation as a result of the new economic environment and has delayed the deal indefinitely. Which of the following strategies is the best way to address this situation?()
第10题:
The sales team has just sold the first pSeries solution to a Windows NT customer. The team has identified concerns with a non-existent backup strategy and some workable environmental issues. In addition to these concerns,what other major concern should be considered?()